Tips From A Shipwright

  • Rank #
  • Premiered: Jun 2016
  • Episodes: 136
  • Followers: 0
  • Running
  • YouTube
  • at 0
  • Documentary

Seasons:

You need to be logged in to mark episodes as watched. Log in or sign up.

Season 3
3x1
Shop Intro
Episode overview
Air date
May 15, 2020
Get ready for Season 3 of Tips from a Shipwright with Louis Sauzedde! Enjoy this introduction to our new shop and plans for the coming year. More boats, more woodworking, more .. show full overview
3x2
How To Choose The Best Lumber For Boat Building And More
Episode overview
Air date
May 24, 2020
This week we're headed out to Cornwall CT to visit our friend Duke at New England Naval Timbers and purchase some lumber for the 23' V-Bottom skiff we're building. We've rented a .. show full overview
3x3
Sawing Up Our Lumber
Episode overview
Air date
May 30, 2020
In this episode Lou breaks down the lumber he purchased and explains to use how its priced per board foot and other details. He then shows us how he sets up and uses his skill saw to rip the pieces he needs for the 23' V-bottom skiff he is building.
3x4
Drawing The Flat Bottom Work Skiff
Episode overview
Air date
Jun 05, 2020
This week Lou sits down at his drawing table to begin producing the lines for the original flat bottom work skiff from our first series. Learn about how a boats shape is conceived and .. show full overview
3x5
How To Sharpen And Rip With A Chainsaw
Episode overview
Air date
Jun 14, 2020
This week we head to the mill to saw up our knees using a chainsaw. Lou shows us his tips and tricks for sharpening and ripping with a chainsaw in the field.
3x6
Installing The Knees
Episode overview
Air date
Jun 21, 2020
Change of plans, the knees we cut out looked so nice we're not gonna wait to enjoy them, they're going in the 18' foot skiff!
3x7
How To Make A Good Set of Saw Horses
Episode overview
Air date
Jul 03, 2020
In this episode Lou shows us how to make one of the most used tools in his shop, the saw horse.
3x9
Building The Transom
Episode overview
Air date
Aug 28, 2020
We're getting close to springing our 23' V-Bottom skiff together. This week Lou shows us how he built the transom from six layers of 7/16 inch white oak epoxied and vacuumed bagged together.
3x8
Fit The Side Planking
Episode overview
Air date
Sep 13, 2020
In this Episode we're fitting the side planking together as we are getting ready to spring our V-Bottom Skiff together. Each plank is still over 25 feet long at this point so it is .. show full overview
3x13
Hanging The Frames
Episode overview
Air date
Oct 09, 2020
Now that we have our chines in place it's time to hang our frames. We're going to get them out of pieces of white oak left over from the chines and other things. Once we have our stock .. show full overview
3x10
Setting Up The Molds And Stem
Episode overview
Air date
Oct 11, 2020
We're getting close to planking up our 23' V-Bottom Skiff. This week we are finalizing the set-up by taking dimensions off the model and then using them to create molds to bend our .. show full overview
3x11
Fastening On Our First Side Planks
Episode overview
Air date
Oct 26, 2020
We’re back working on our 23’ V-Bottom skiff, but before that we’re taking a trip back to New England Naval Timbers to see our good friend Duke about sourcing an extremely large flitch .. show full overview
3x12
Installing The Chines
Episode overview
Air date
Nov 20, 2020
Our V-Bottom skiff is really starting to take shape and this week is a big moment because we're installing the chines. You remember we sourced these at the lumber mill and then .. show full overview
3x14
Laying Down The Sole
Episode overview
Air date
Dec 25, 2020
We're making great progress on our V-Bottom skiff and with our frames in it's now time to lay down the sole. This will be the layer that you stand on when the boat is flipped over. .. show full overview
3x15
Installing The Keelson
Episode overview
Air date
Jan 08, 2021
We're getting pretty close to putting on our bottom, but before we can do that we need to install our keelson. This is the long timber that runs from the stem to the transom and accepts .. show full overview
3x16
The Keel
Episode overview
Air date
Jan 15, 2021
In this weeks episode Lou shows us how he installs the keel and how the bottom layers and fiberglass all come together on the center line.
3x17
The V-Bottom, Work Skiff & Dory Together At The Dock!
Episode overview
Air date
Jan 28, 2021
This week Lou takes us back in time with his V-Bottom Work Skiff and Sport Dory. Learn how to properly dock your boat and take a look back at the series that lead us to the here and .. show full overview
3x18
The Stringers
Episode overview
Air date
Feb 10, 2021
It's time to install our longitudinal stringers. These are the pieces of lumber that will span the space between the bottom of the boat and the sole. Each piece needs to be scribed on .. show full overview
3x19
Bottom Planking
Episode overview
Air date
Feb 28, 2021
This week we're putting on our first layer of bottom planking. It's hang-over and cut off with a twist.
3x20
Finishing The First Layer Of Bottom Planking
Episode overview
Air date
Mar 14, 2021
We're getting ready for our first layer of fiberglass but we still have a little more planking to go. In this episode we're going to take a closer look at what's going on underneath the deck before we close her up for good.
3x21
First Layer Of Fiberglass
Episode overview
Air date
Mar 29, 2021
It's time to fiberglass! This is a a very important step in the construction of our V-Bottom skiff. The boat is a wooden boat at heart but the bottom will be a composite construction .. show full overview
3x22
Second Layer Of Bottom Planking
Episode overview
Air date
Apr 14, 2021
We're having a blast working on our V-Bottom skiff and things are really starting to come together. It's time for us to put on our second layer of bottom planking. We're going to use .. show full overview
3x23
Fastenings & Prep For Final Layers Of Fiberglass
Episode overview
Air date
May 07, 2021
This week we're going to show you how we remove the temporary fastening used to secure the second layer of planking and use those same holes for our final fastenings. This way we can .. show full overview
3x24
Fiber-Glassing The Bottom
Episode overview
Air date
Jul 03, 2021
It's time to put the final two layers of 1708 fiberglass on our V-Bottom Skiff. This is a very important part of the construction as it was designed with the intention of keeping the .. show full overview
3x25
Fairing The Hull
Episode overview
Air date
Oct 27, 2021
It’s time to fair the hull of our V-Bottom skiff, but before we can do that we need to sand and prep the surface. We created a new vacuum system for our sander to help with any .. show full overview
3x26
How To Apply 2-Part Epoxy Barrier Coat To The Hull
Episode overview
Air date
Nov 15, 2021
We’ll we’ve faired it and we’ve sanded it and it’s time to apply Totalprotect 2-part epoxy barrier coat to the hull of our V-Bottom skiff. This will act as a protection for the .. show full overview
3x27
Building The Wheels
Episode overview
Air date
Dec 07, 2021
In this episode Lou shows us how he's contructing the large wheels he's going to use to roll the boat over, right in place. In order to do this he need to find the exact center and how .. show full overview
3x28
Flipping Over The Hull
Episode overview
Air date
Jan 16, 2022
It's time to flip over the hull of our V-Bottom skiff using our wheels! We've got everything set up, our wheels are anchored to the boat with wedges and are sitting upon our rollers on .. show full overview
3x29
Side Planking
Episode overview
Air date
Jan 25, 2022
With our V-Bottom flipped over upside right, it’s time to finish the planking. You remember we put the first two planks on when we were springing the boat together. We’ve got four more .. show full overview
3x30
Cutting The Sheer Line
Episode overview
Air date
Jan 30, 2022
We've got our V-Bottom skiff all planked up and now it's time to cut the sheer line! In order to do this I've had to modify my skill saw to cut as deep as possible because we're not .. show full overview
3x31
Ripping The Guards
Episode overview
Air date
Feb 08, 2022
We’ve decided to adjust our sheer a little bit, we’re going to bring it down a little bit at the bow but mostly our goal is to reduce the angle on the heads of the frames and the sheer .. show full overview
3x32
Laminating The Cutwater
Episode overview
Air date
Feb 17, 2022
In this episode it's time to laminate our cutwater. This piece will run from the very top of the bow down the front of the boat and connect with that scarf we made in the keel. We're .. show full overview
3x33
Shaping The Stemhead With A Chainsaw
Episode overview
Air date
Feb 23, 2022
This week we’re going to shape our cutwater, stem head and fasten on our guards. But first we need to make some final adjustments to the boat, we’re actually going to plane back the .. show full overview
3x34
Shaping The Breasthook
Episode overview
Air date
Mar 04, 2022
This week we’re shaping and installing our breasthook. The first step is to make a paper pattern from the boat so we have a shape to go from. We’ll then take that over to our .. show full overview
3x35
Fairing The Hull For Our 2-Part Epoxy Barrier Coat Primer
Episode overview
Air date
Mar 14, 2022
We're getting close to finishing up our V-Bottom skiff, there's a little word work left to do but first we need to fair and prime the hull. The hull needs to be planed first to get any .. show full overview
3x36
Getting Out The Knees & Priming The Hull
Episode overview
Air date
Apr 06, 2022
We're back from a short vacation and ready to put the final touches on our V-Bottom Skiff! This week it's time for us to get out our corners knees and our inwhales and caps. The knees .. show full overview
3x37
Laminating Our Knees With Epoxy
Episode overview
Air date
Apr 17, 2022
This week we're going to show you how we saw up and laminate our knees. They're made from white oak laminates and will be over 2 inches thick when all glued up. Using the top figured .. show full overview
3x38
Timbers For ORCA & Installing The Knees
Episode overview
Air date
Apr 30, 2022
Well you guys guessed it, those timbers are for our upcoming ORCA build, we’ll be showing lots more about the construction and design process very shortly, but first it’s time for us to .. show full overview
3x39
Finishing The Knees And Getting Out The Inwhales
Episode overview
Air date
Jun 03, 2022
This week we're installing the inwhales on our V-Bottom Skiff so we need to finish up our knees to accept them. The laminated knee and top figured knee have already been dry fit but .. show full overview
3x40
Installing The Inwhales
Episode overview
Air date
Jun 03, 2022
It's a Tips double header, two episodes this week and more to come! This week is a especially challenging step in our V-Bottom Skiff build, installing the inwhales. There is really .. show full overview
3x41
Plane Crazy - How To Plane On A Curve
Episode overview
Air date
Jun 15, 2022
We're just about ready to put the caps on our V-Bottom skiff but first we need to prepare the tops of the in-whales and guards to receive them. I'm going to use a pencil to mark the .. show full overview
3x42
Fitting The Caps
Episode overview
Air date
Jun 15, 2022
In this episode we're going to get out and fit the caps on our V-Bottom Skiff. These are white oak pieces of lumber that we specifically chose to help follow the curve of the boat. We .. show full overview
3x43
Scarfing The Caps With A Ship-Saw And Rabbit Plane
Episode overview
Air date
Jun 22, 2022
This week we’re going to show you how I use my ship-saw and a rabbit plane to make the scarfs to connect the pieces that make up the caps.
3x44
Final Steps Of Construction
Episode overview
Air date
Jul 21, 2022
We've finally come to the last bits of construction on our V-Bottom Skiff. This week we're out to glue up and fasten down our caps. This may seem like an easy step but it's actually .. show full overview
3x45
Plugging Away
Episode overview
Air date
Jul 31, 2022
This week we’re going to show you how we create and plug the holes from our fastenings. We’re going to use the same material we used for the caps, in-whale and guards so they match in color and grain as best as possible.
3x46
How To Varnish Your Wooden Boat
Episode overview
Air date
Sep 03, 2022
This episode has no summary.
3x47
Plunge Cutting The Transom For Our Outboard Motor Install
Episode overview
Air date
Sep 10, 2022
We've got our V-Bottom Skiff all varnished up with TotalBoat Lust and she's looking absolutely fantastic. The next step for us is to cut down the transom to make it the right height to .. show full overview
3x48
Painting Up The Topside, Bottom And Out The Open Door!
Episode overview
Air date
Oct 05, 2022
The V-Bottom Skiff is going out the door! In this episode we put on our final coat of TotalBoat Wet Edge topside paint and also a final coat of Spartan Red bottom paint. This has been .. show full overview
3x49
Sea Trials
Episode overview
Air date
Dec 21, 2022
We've all been anxious for this moment, sea trials on our 23' V-Bottom Skiff! It's been 10 years in the making and to finally get it finished and in the water is a real achievement for .. show full overview

If there are missing episodes or banners (and they exist on TheTVDB) you can request an automatic full show update:

Request show update