Tips From A Shipwright

Building The Transom (3x9)


Air date: Aug 28, 2020

We're getting close to springing our 23' V-Bottom skiff together. This week Lou shows us how he built the transom from six layers of 7/16 inch white oak epoxied and vacuumed bagged together.

  • Rank #
  • Premiered: Jun 2016
  • Episodes: 142
  • Followers: 0
  • Running
  • YouTube
  • at 0