You need to be logged in to mark episodes as watched. Log in or sign up.
Season 45
The crew starts a new project in Lexington, MA, to make a 1960 mid-century modern home accessible for a family with a son who has Duchenne Muscular Dystrophy. The crew meets the
.. show full overview
The crew starts a new project in Lexington, MA, to make a 1960 mid-century modern home accessible for a family with a son who has Duchenne Muscular Dystrophy. The crew meets the homeowners to learn about the disease and the challenges the current setup of the house poses. The project is a race against time, but the crew is determined to get the family back into their home as soon as possible.
Construction begins on the 1960 mid-century modern home in Lexington, MA project. The interior is fully demolished, and work begins on the foundation to address the depth. The architect
.. show full overview
Construction begins on the 1960 mid-century modern home in Lexington, MA project. The interior is fully demolished, and work begins on the foundation to address the depth. The architect gives an overview of the new design plan which prioritizes accessibility. An accessibility solutions showroom is toured. A new energy code affects the construction.
Accessibility is at the forefront of this renovation, which requires major changes. A new mechanical space is being created out front and will be connected to the old mechanical space by
.. show full overview
Accessibility is at the forefront of this renovation, which requires major changes. A new mechanical space is being created out front and will be connected to the old mechanical space by a new concrete block wall. Out back, a new foundation has been poured for a larger walkout basement. The new HVAC ducts are installed considering the new energy code. Framing for the new elevator begins.
Great progress is being made on the project house. The primary addition is being framed and the rooms are starting to take shape. A sound deadening wall is built. A lally column is
.. show full overview
Great progress is being made on the project house. The primary addition is being framed and the rooms are starting to take shape. A sound deadening wall is built. A lally column is removed and a larger ridge beam is installed to create an open kitchen and dining area. The homeowners choose hardscape finishes based on 3D renderings. An accessible designed bathroom is toured.
A tour of the progress and upcoming changes are shared, including the new wall of glass with a zero-threshold sliding glass door to the back patio. Framing begins for the new slider. The
.. show full overview
A tour of the progress and upcoming changes are shared, including the new wall of glass with a zero-threshold sliding glass door to the back patio. Framing begins for the new slider. The geothermal heating and cooling system is explained, and back at the house, the wells are dug. At the front of the house, steel columns and a beam which will be the entrance's new focal point are being installed.
The project house is progressing with an eye toward accessibility and the mid-century modern aesthetic. Geothermal pipes are run from the wells into the house. Wood blocking is installed
.. show full overview
The project house is progressing with an eye toward accessibility and the mid-century modern aesthetic. Geothermal pipes are run from the wells into the house. Wood blocking is installed for the future mounting of assistive devices. The new floor system allows for running new electrical wires without being visible. Old receptacle boxes in the original brick walls are replaced without damage.
A progress tour of the house is given, starting at the back addition, through the walkout basement and mechanical spaces, then up to the main floor. Repairs are made to the 1960 brick,
.. show full overview
A progress tour of the house is given, starting at the back addition, through the walkout basement and mechanical spaces, then up to the main floor. Repairs are made to the 1960 brick, including matching the original color and texture of the mortar. The homeowner gets help building a DIY ramp. Nearby, a modern accessible house is toured. New energy codes prompt changes to the exterior trim plan.
The roof of the Lexington project is a mix of multiple roof types and pitches. A custom gutter with a downspout is recessed into the overhang to manage the volume of rainfall it will
.. show full overview
The roof of the Lexington project is a mix of multiple roof types and pitches. A custom gutter with a downspout is recessed into the overhang to manage the volume of rainfall it will yield. The house next door, one of three designed and built by the same original architect and still maintains much of the original mid-century modern features, is toured. New energy-efficient windows are installed.
The renovation has reached the halfway point. Kevin O'Connor gets a lesson on stucco from Mark McCullough before meeting with homeowner Michelle and kitchen designer Melinda Guglieta to
.. show full overview
The renovation has reached the halfway point. Kevin O'Connor gets a lesson on stucco from Mark McCullough before meeting with homeowner Michelle and kitchen designer Melinda Guglieta to learn about the finish chosen for the kitchen cabinets. Back at the house, Tom Silva begins installing the nickel gap siding. Out back, Jenn Nawada and Charlie Silva address the drainage concern for the patio.
Mid-century modern details are taking shape on the exterior. On the interior, rigid foam is installed on the subfloor to meet strict energy codes. The homeowner goes shopping for door
.. show full overview
Mid-century modern details are taking shape on the exterior. On the interior, rigid foam is installed on the subfloor to meet strict energy codes. The homeowner goes shopping for door hardware with accessible considerations. A single tile prep and waterproofing system is used to create a watertight bathroom for zero threshold entry to the shower. A motorized multi-slide door is installed.
The therapy pool is scheduled to be delivered onsite. To reduce the risk of shock, Heath Eastman installs bonding around the pool's perimeter. Inside, Interior designer Rachel Dunham
.. show full overview
The therapy pool is scheduled to be delivered onsite. To reduce the risk of shock, Heath Eastman installs bonding around the pool's perimeter. Inside, Interior designer Rachel Dunham talks tile selections with Kevin O'Connor. Tom and Charlie Silva recap the construction processes of the integrated ramp at the front entrance. Electrical work for the elevator begins. The therapy pool is craned in.
Progress continues on the mid-century modern house in Lexington. Exterior painting and interior flooring installation are underway. The elevator cab is built and is operable. The kitchen
.. show full overview
Progress continues on the mid-century modern house in Lexington. Exterior painting and interior flooring installation are underway. The elevator cab is built and is operable. The kitchen island gets a decorative finish using some of the white oak hardwood flooring. Audio-visual technologies are explored for accessibility for the home, and solar panels are installed on the roof.
The new mechanical room is revealed. Heath Eastman installs in-wall lights at the front ramp. Richard Trethewey and plumber Abe Bilo install an offset sink drain. Kevin O'Connor visits a
.. show full overview
The new mechanical room is revealed. Heath Eastman installs in-wall lights at the front ramp. Richard Trethewey and plumber Abe Bilo install an offset sink drain. Kevin O'Connor visits a local glass studio where the homeowners' son Wix is assisting glass artists Andrew Iannazzi and Emery Wenger with making a custom piece. Tom Silva begins installing support bars in Caffrey's bathroom.
The project is just weeks away from completion. The homeowners sit down for an interview about their son Caffrey's diagnosis with Duchenne muscular dystrophy. His room gets a
.. show full overview
The project is just weeks away from completion. The homeowners sit down for an interview about their son Caffrey's diagnosis with Duchenne muscular dystrophy. His room gets a contemporary painted accent wall. The new staircase, which is a combination of steel railings and stringers and oak stair treads, is installed. Both new plants as well as some existing rose bushes are planted.
The homeowners son has Duchenne muscular dystrophy. For this reason, the 1960 mid-century modern home is being renovated to make it accessible. Outside, a pool lift was installed, and a
.. show full overview
The homeowners son has Duchenne muscular dystrophy. For this reason, the 1960 mid-century modern home is being renovated to make it accessible. Outside, a pool lift was installed, and a patio with zero-threshold access to the interior was built. A final review of the geothermal system is done. Accessible kitchen appliances and a fire-rated door are installed. A blower door test is performed.
Just ten months ago, construction began in historic Lexington, MA, to make a 1960 mid-century modern home accessible for a family whose son has Duchenne muscular dystrophy. Because the
.. show full overview
Just ten months ago, construction began in historic Lexington, MA, to make a 1960 mid-century modern home accessible for a family whose son has Duchenne muscular dystrophy. Because the prognosis of the disease is a complete loss of mobility within a year, Charlie Silva and his team of experts fast-tracked this project to meet this deadline. Today, the crew is back to check out the transformation.
This episode has no summary.
This episode has no summary.
This episode has no summary.
This episode has no summary.
If there are missing episodes or banners (and they exist on TheTVDB) you can request an automatic full show update:
Request show update
Update requested