Autumn Woods House: Foundation and Cap
As crews complete the foundation and cap, Dean discusses the plan with the architects and Robin tours a factory producing high-tech engineered lumbe
Autumn Woods House: Foundation and Cap
As crews complete the foundation and cap, Dean discusses the plan with the architects and Robin tours a factory producing high-tech engineered lumbe
Data de estreia
Out 06, 2001
Autumn Woods House: Framing Walls and Roof
Dean and Robin explain the off-site wall-framing system as the first floor walls are craned into position. After roof framing, custom windows
.. show full overview
Autumn Woods House: Framing Walls and Roof
Dean and Robin explain the off-site wall-framing system as the first floor walls are craned into position. After roof framing, custom windows are installed and Dean highlights the unique mullion treatment and improved operation of the double-hung windows.
Data de estreia
Out 13, 2001
Autumn Woods House: Rough-Ins
A new solderless, crimping system for copper pipe is demonstrated as the heating, plumbing, and electrical rough-ins begin. Also featured are a new wood
.. show full overview
Autumn Woods House: Rough-Ins
A new solderless, crimping system for copper pipe is demonstrated as the heating, plumbing, and electrical rough-ins begin. Also featured are a new wood composite product used for casing, eaves, and fascia, and high-tech wiring for whole-house audio, phone, and computer networking.
Data de estreia
Out 20, 2001
Autumn Woods House: Weatherization and Drywall
Dean and Robin talk about critical steps that must be taken to ensure that the home is fully weatherized and insulated before hanging the drywall.
Autumn Woods House: Weatherization and Drywall
Dean and Robin talk about critical steps that must be taken to ensure that the home is fully weatherized and insulated before hanging the drywall.
Data de estreia
Out 27, 2001
Autumn Woods House: Exterior Wrap
Installation of the exterior elements nears completion as the dormers are finished with cedar shingle panels, the first two coats of stucco are applied and final grading begins.
Autumn Woods House: Exterior Wrap
Installation of the exterior elements nears completion as the dormers are finished with cedar shingle panels, the first two coats of stucco are applied and final grading begins.
Data de estreia
Nov 03, 2001
Autumn Woods House: Landscaping
Dean and Robin highlight installation of the paver patio and driveway.
Autumn Woods House: Landscaping
Dean and Robin highlight installation of the paver patio and driveway.
Data de estreia
Nov 10, 2001
Autumn Woods House: Planting
With hardscape done, Dean and Robin work with a landscape designer on preparing new beds for trees, shrubs, and perennials.
Autumn Woods House: Planting
With hardscape done, Dean and Robin work with a landscape designer on preparing new beds for trees, shrubs, and perennials.
Data de estreia
Nov 17, 2001
Autumn Woods House: Floors, Stone, and Ceramic Tile
Dean and Robin cover the floors, highlighting the wood, stone, and ceramic tile materials used in the house.
Autumn Woods House: Floors, Stone, and Ceramic Tile
Dean and Robin cover the floors, highlighting the wood, stone, and ceramic tile materials used in the house.
Data de estreia
Nov 24, 2001
Autumn Woods House: Doors and Cabinets
As home construction continues, Dean and Robin highlight the home's custom doors and cabinets, which assume more importance in this home because there is less emphasis placed on wood trim and mouldings.
Autumn Woods House: Doors and Cabinets
As home construction continues, Dean and Robin highlight the home's custom doors and cabinets, which assume more importance in this home because there is less emphasis placed on wood trim and mouldings.
Data de estreia
Dez 01, 2001
Autumn Woods House: Kitchen
Dean and Robin finish the main elements in the kitchen as the countertops, plumbing fixtures, and appliances are installed.
Autumn Woods House: Kitchen
Dean and Robin finish the main elements in the kitchen as the countertops, plumbing fixtures, and appliances are installed.
Data de estreia
Dez 08, 2001
Autumn Woods House: Wine Cellar
As finish elements come together in the lower level, Dean and Robin focus on the racking and climate-control issues when setting up a room for wine storage.
Autumn Woods House: Wine Cellar
As finish elements come together in the lower level, Dean and Robin focus on the racking and climate-control issues when setting up a room for wine storage.
Data de estreia
Dez 15, 2001
Autumn Woods House: Home Theater
Dean and Robin work with a custom electronics specialist to finish the distributed audio system, hook up a state-of-the-art home theater, and install controls for security, phones, and computers throughout the house.
Autumn Woods House: Home Theater
Dean and Robin work with a custom electronics specialist to finish the distributed audio system, hook up a state-of-the-art home theater, and install controls for security, phones, and computers throughout the house.
Data de estreia
Dez 22, 2001
Autumn Woods House: Construction Wrap
Dean and Robin discuss the final installations as painting, papering, and carpeting wrap up.
Autumn Woods House: Construction Wrap
Dean and Robin discuss the final installations as painting, papering, and carpeting wrap up.
Data de estreia
Dez 29, 2001
Autumn Woods Completion: Decorating
Dean and Robin work with a custom electronics specialist to finish the distributed audio system, hook up a state-of-the-art home theater, and install
.. show full overview
Autumn Woods Completion: Decorating
Dean and Robin work with a custom electronics specialist to finish the distributed audio system, hook up a state-of-the-art home theater, and install controls for security, phones, and computers throughout the house.
Data de estreia
Jan 05, 2002
Autumn Woods Completion: Furnishing
Dean and Robin discuss the final installations and install furniture
Autumn Woods Completion: Furnishing
Dean and Robin discuss the final installations and install furniture