Tens de ter sessão iniciada para marcar episódios como vistos. Iniciar sessão ou registar.
Temporada 13
Data de estreia
Jan 16, 1999
Starting a new project literally from the ground up, Dean and Robin help out as a log shell is trucked in and assembled by crane and crew on a lakeside lot.
Starting a new project literally from the ground up, Dean and Robin help out as a log shell is trucked in and assembled by crane and crew on a lakeside lot.
Data de estreia
Jan 23, 1999
Dean and Robin help when logs, pine planking, and insulated panels are set in place for the roof of the log home. Stonework begins on the foundation
Dean and Robin help when logs, pine planking, and insulated panels are set in place for the roof of the log home. Stonework begins on the foundation
Data de estreia
Jan 30, 1999
Dean Johnson and Robin Hartl lend a hand with some of the exterior work on the log vacation home. A concrete patio and the roof tiles are installed
Dean Johnson and Robin Hartl lend a hand with some of the exterior work on the log vacation home. A concrete patio and the roof tiles are installed
Data de estreia
Fev 06, 1999
Dean and Robin help button up the exterior of the lakeside log home with windows and doors. Inside, work begins on the mechanical systems, partition walls, and chinking.
Dean and Robin help button up the exterior of the lakeside log home with windows and doors. Inside, work begins on the mechanical systems, partition walls, and chinking.
Data de estreia
Fev 13, 1999
Dean Johnson and Robin Hartl help with the electrical rough-in and heating. and chinking between the logs for the lakeside log vacation home.
Dean Johnson and Robin Hartl help with the electrical rough-in and heating. and chinking between the logs for the lakeside log vacation home.
Data de estreia
Fev 20, 1999
Dean and Robin talk about sealing the home up tight as a crew covers the trap rod between the logs with acrylic chinking material. They also talk with carpentry sub Dick Biscobing about
.. show full overview
Dean and Robin talk about sealing the home up tight as a crew covers the trap rod between the logs with acrylic chinking material. They also talk with carpentry sub Dick Biscobing about prepping log walls for cabinets with slip joints to keep log shrinkage and settling from racking the cabinets. They update mechanical rough-ins, start installing drywall and show the initial framing for a complicated set of windows on the home's lakeside gable end
Data de estreia
Fev 27, 1999
Dean talks about the new gypsum thermal underlayment as it's poured over all the radiant floor tubes on the first and second floors. Robin talks with Dick Biscobing about the siding
.. show full overview
Dean talks about the new gypsum thermal underlayment as it's poured over all the radiant floor tubes on the first and second floors. Robin talks with Dick Biscobing about the siding treatments for the home's unique bumpouts and dormers and about the pine casing for the windows set right in the logs. Dean works with Dwight Hawkinson on the Norwegian white spruce sauna in the lower level bath
Data de estreia
Mar 06, 1999
Dean talks about the unique, soapstone masonry heater being installed in the lower level as work continues on taping the drywall and siding the bumpouts. In addition, Dick Biscobing
.. show full overview
Dean talks about the unique, soapstone masonry heater being installed in the lower level as work continues on taping the drywall and siding the bumpouts. In addition, Dick Biscobing shows Robin how the log railings are being assembled on the master bedroom loft, and Dean and Robin talk about spreading crack isolation membrane over the underlayment to help keep tile from cracking.
Data de estreia
Mar 13, 1999
Dean and Robin show how to cut out unneeded sections of tie log over the great room, and they talk to Dick Biscobing and his crew about the installation of the log stairway. In addition,
.. show full overview
Dean and Robin show how to cut out unneeded sections of tie log over the great room, and they talk to Dick Biscobing and his crew about the installation of the log stairway. In addition, the white oak trim and the new cabinets are delivered, and tile contractor Troy Stolpe begins installing the filled and honed limestone floor tiles in the master bath
Data de estreia
Mar 20, 1999
Dean and Robin install kitchen cabinets and get ready for countertops. Larry Stolpe begins laying the soapstone tile floor in the lower level bathroom. And Dean visits a recreational gaming showroom to browse through various home options.
Dean and Robin install kitchen cabinets and get ready for countertops. Larry Stolpe begins laying the soapstone tile floor in the lower level bathroom. And Dean visits a recreational gaming showroom to browse through various home options.
Data de estreia
Mar 27, 1999
Dean and Robin work on the special details to polish off the lakeside log vacation home, including handcrafted tiles in the master bath featuring animal accents, granite and solid
.. show full overview
Dean and Robin work on the special details to polish off the lakeside log vacation home, including handcrafted tiles in the master bath featuring animal accents, granite and solid surface countertops, white oak interior doors, the lakeside gable end windows and doors, plumbing fixtures, lights and appliances.
Data de estreia
Set 25, 1999
Dean Johnson and Robin Hartl explain the tinted and textured plaster treatment applied to the drywall partition walls. They also highlight the handcrafted wall tile in the lower level bath, the solid surface tub deck and the cast iron whirlpool tub.
Dean Johnson and Robin Hartl explain the tinted and textured plaster treatment applied to the drywall partition walls. They also highlight the handcrafted wall tile in the lower level bath, the solid surface tub deck and the cast iron whirlpool tub.
Data de estreia
Out 02, 1999
Dean Johnson and Robin Hartl talk about chinking the logs outside, capping the stone foundation, and finishing the soffit details. They also install the workshop cabinets.
Dean Johnson and Robin Hartl talk about chinking the logs outside, capping the stone foundation, and finishing the soffit details. They also install the workshop cabinets.
Data de estreia
Out 09, 1999
Dean Johnson and Robin Hartl add decorative carving to the tie-log ends, finish the slip joints, install shower doors, and put in workshop countertops and flooring
Dean Johnson and Robin Hartl add decorative carving to the tie-log ends, finish the slip joints, install shower doors, and put in workshop countertops and flooring
Data de estreia
Out 16, 1999
Dean Johnson and Robin Hartl discuss landscaping, finishing the wood floors, installing a home theater and furnishing a log home as they wrap up the project with final tours of the main living spaces.
Dean Johnson and Robin Hartl discuss landscaping, finishing the wood floors, installing a home theater and furnishing a log home as they wrap up the project with final tours of the main living spaces.
Se faltar algum episódio ou banner (e eles existirem no TheTVDB) podes solicitar uma atualização automática:
Pede uma actualização
Actualização pedida