Practical Engineering

Practical Engineering

How This Bridge Was Rebuilt in 15 Days After Hurricane Ian (2022x23)

Épisode final de la saison

Date de diffusion: Déc 20, 2022

The Sanibel Causeway was rendered completely impassable to vehicles. Less than a month later, it was open to traffic.

  • Classement #
  • Première: Oct 2014
  • Épisodes: 206
  • Abonnés: 0
  • En cours
  • YouTube
  • à 0