Episode 1 is all about the first day "on site." We have to find existing infrastructure, position the home on the site, mark and square up the foundation and set reference pins, dig the footings, set grade pegs, and install steel in the footings.
Episode 1 is all about the first day "on site." We have to find existing infrastructure, position the home on the site, mark and square up the foundation and set reference pins, dig the footings, set grade pegs, and install steel in the footings.
In Episode 2 we pour the concrete footings and build the block foundation that will be the form for the slab. The next steps will be forming the concrete porches, installing the slab
.. show full overview
In Episode 2 we pour the concrete footings and build the block foundation that will be the form for the slab. The next steps will be forming the concrete porches, installing the slab plumbing, and doing the gravel and vapor barrier for under the slab. There is tons of great information about how (and why) we are doing these processes the way we are. These videos paint a very real picture of what it is like to on the job with our crew for the day! We also check out an old bus on the property to see if it would be a good candidate to be converted into a cool camper.
In Episode 3 we do the slab plumbing (drain and supply lines), form up the outdoor patio slabs, and add washed 57 stone to the foundation. We also test out our mud tires, check out some
.. show full overview
In Episode 3 we do the slab plumbing (drain and supply lines), form up the outdoor patio slabs, and add washed 57 stone to the foundation. We also test out our mud tires, check out some new video equipment, and take a fun trip down to the local hardware store! There is tons of great information about how (and why) we are doing these processes the way we are. These videos paint a very real picture of what it is like to on the job with our crew for the day!
In Episode 4 we do the final prep work for the pouring the slab, or so I thought! This includes compacting the #57 washed stone, tying steel, and adding a code approved vapor barrier.
.. show full overview
In Episode 4 we do the final prep work for the pouring the slab, or so I thought! This includes compacting the #57 washed stone, tying steel, and adding a code approved vapor barrier. I also dive into the things I’ve been doing in the background to keep this project on schedule for the next few months. This includes ordering the windows and Trusses.
In Episode 5 we do the "actual" final prep for the slab, by forming a recessed area for a curb-less tile shower. This was a change that the homeowner had made that i had totally
.. show full overview
In Episode 5 we do the "actual" final prep for the slab, by forming a recessed area for a curb-less tile shower. This was a change that the homeowner had made that i had totally forgotten about! We also pour the concrete slab and explain the placing and finishing processes, concrete mixture, and the reasons for control joints.
In Episode 6 we FINALLY get to start framing... this is the fun part for me. I love seeing one of our designs come to life day by day as we build. We will be building the first floor
.. show full overview
In Episode 6 we FINALLY get to start framing... this is the fun part for me. I love seeing one of our designs come to life day by day as we build. We will be building the first floor walls, and as always sharing some techniques that have saved us time and also some technical info on the structure of these walls. We also build the BIG window wall on the high side of the single pitch roof, and this is one that has been on my mind for a while due to its size and weight.
In Episode 7 we frame the gable end walls, interior walls, and assemble the second floor system that will make the loft area of the home. We also set 8x8 posts and LVL girders to carry
.. show full overview
In Episode 7 we frame the gable end walls, interior walls, and assemble the second floor system that will make the loft area of the home. We also set 8x8 posts and LVL girders to carry the roof system out over the covered patio, and this space turned out awesome! And of course we tell you all about the problems we run into... and on this episode we had one of the craziest OOPS moments ever!
In Episode 8 we finally build the roof system to get this home “in the dry.” Unfortunately, to do this we have to battle wet weather! We are using parallel cord engineered roof trusses
.. show full overview
In Episode 8 we finally build the roof system to get this home “in the dry.” Unfortunately, to do this we have to battle wet weather! We are using parallel cord engineered roof trusses that are full span from exterior wall to exterior wall. In this episode we also build the overhangs, install the sub-facia, do the roof sheathing and underlayment!
In Episode 9 we finish the last bit of framing, including the wall connecting the first and second floor roofs and the small roof over the master bathtub. For this section we "stick
.. show full overview
In Episode 9 we finish the last bit of framing, including the wall connecting the first and second floor roofs and the small roof over the master bathtub. For this section we "stick frame" instead of using engineered trusses. There is charts in the code book and on the American Wood Council web site (or app called SpanCalc) that detail allowable spans for different type materials.
In Episode 10 we finish drying in this structure by installing the Andersen windows! This includes a description and steps of the method we use for installation (there are many ways you
.. show full overview
In Episode 10 we finish drying in this structure by installing the Andersen windows! This includes a description and steps of the method we use for installation (there are many ways you could do this). We also install the finished facia boards and finished soffit, which includes a venting system for the roof.
On Episode 11 Jaime, Erik, and the Perkins Crew start the exterior finish of this home by processing, pre-finishing and install all of the corner boards, door trim and window trim. This
.. show full overview
On Episode 11 Jaime, Erik, and the Perkins Crew start the exterior finish of this home by processing, pre-finishing and install all of the corner boards, door trim and window trim. This includes fabrication of drip cap for above the stonework. We also install the french doors and take a trip down to the local paint store to do some color testing for a faux wood finish on our Smart Side Shake panels.
On Episode 12 Jaime, Erik, and the Perkins Crew finish the exterior finish of the Modern Mountain Getaway with two different types of siding! We include some of our finishing processes
.. show full overview
On Episode 12 Jaime, Erik, and the Perkins Crew finish the exterior finish of the Modern Mountain Getaway with two different types of siding! We include some of our finishing processes as well as the installation. We also include details of installing drip caps for window trims and band boards that separate the different types of siding.
On Episode 13 Jaime, Erik, and the Perkins Crew Take this home one step closer to being finished by getting all of the mechanical systems for this home installed! In this case, that includes plumbing, wiring, and Heat/Air.
On Episode 13 Jaime, Erik, and the Perkins Crew Take this home one step closer to being finished by getting all of the mechanical systems for this home installed! In this case, that includes plumbing, wiring, and Heat/Air.
On Episode 14 Jaime, Erik, and the Perkins Crew Take this home one step closer to being finished. We start out with prepping for and installing the tongue and groove ceiling over the
.. show full overview
On Episode 14 Jaime, Erik, and the Perkins Crew Take this home one step closer to being finished. We start out with prepping for and installing the tongue and groove ceiling over the covered porch and zen seating area. This is a pine tongue and groove finished with an exterior deck stain (we did this in our shop).
On Episode 15 we show the items that the building inspector failed us on the framing, electrical, plumbing, and HVAC inspections. Unfortunately, we were not able to film the inspection
.. show full overview
On Episode 15 we show the items that the building inspector failed us on the framing, electrical, plumbing, and HVAC inspections. Unfortunately, we were not able to film the inspection process due to the virus. Erik and Jaime then fix all of the failed items for re-inspection and discuss the reason that each area failed!
On Episode 16 we tackle some of the most tedious and dreaded projects in the building process: Sheetrock and paint! We show the tools and tricks used for sheetrock installation and
.. show full overview
On Episode 16 we tackle some of the most tedious and dreaded projects in the building process: Sheetrock and paint! We show the tools and tricks used for sheetrock installation and finishing, as well as our practices for paint prep. This sounds boring, and maybe it normally is, but not on this channel!
On Episode 17 we tackle the wood accent walls! BUT... to get this project going, we first have to sift through the stacks of wood at our shop and find the best material. Jaime has been
.. show full overview
On Episode 17 we tackle the wood accent walls! BUT... to get this project going, we first have to sift through the stacks of wood at our shop and find the best material. Jaime has been collecting wood since he was a teenager, and in fact scored a new stack of white oak just yesterday as a barter for cleaning out someones barn! In this case we decide to go with a hard maple.
On Episode 18 we get deep into finish work at the modern mountain getaway, as well as finish a few exterior and framing details! We start with the engineered flooring in the loft bedroom. This is a natural finish hickory (meaning it isn't stained).
On Episode 18 we get deep into finish work at the modern mountain getaway, as well as finish a few exterior and framing details! We start with the engineered flooring in the loft bedroom. This is a natural finish hickory (meaning it isn't stained).
On Episode 19 we install a heat mat for the tile in the master bathroom... twice! Turns out you have to buy a heat mat with the exact square footage you need, with no overage! Next, we
.. show full overview
On Episode 19 we install a heat mat for the tile in the master bathroom... twice! Turns out you have to buy a heat mat with the exact square footage you need, with no overage! Next, we grout the mat down and set the locations for the floor transitions in the doorways... very important step!
On Episode 20 we build the tile shower from start to finish! This includes framing, shower pan, liner, walls, waterproofing, tiling, and grouting. It's no wonder tile showers cost 5-10
.. show full overview
On Episode 20 we build the tile shower from start to finish! This includes framing, shower pan, liner, walls, waterproofing, tiling, and grouting. It's no wonder tile showers cost 5-10 times more than a fiberglass insert. This is not one of my favorite projects on the job, but it will definitely be one of the owners favorite features in the home.
On Episode 21 we build and install a custom designed barn door. This process starts at the drafting table to show every step. We also get the concrete floors stained and do some painting
.. show full overview
On Episode 21 we build and install a custom designed barn door. This process starts at the drafting table to show every step. We also get the concrete floors stained and do some painting and finish work around the house. In real time, we will be shooting for a C.O. this week so that the owners can move in by next saturday.
On Episode 22 we build and install the kitchen cabinets! Tons of awesome woodworking and building tips with the Perkins Builder Brothers!
On Episode 22 we build and install the kitchen cabinets! Tons of awesome woodworking and building tips with the Perkins Builder Brothers!
On Episode 23 we build and install the counter tops and floating shelves at the modern mountain getaway! We decide to do a laminated wood counter (instead of a butcher block style) and
.. show full overview
On Episode 23 we build and install the counter tops and floating shelves at the modern mountain getaway! We decide to do a laminated wood counter (instead of a butcher block style) and also take our first shot at concrete counters! We learned a lot and luckily they turned out looking great.
On Episode 24 we build and install a strong, beautiful, and code passing cable rail system in the stairwell! This includes fabrication of the steel framework, and installation of the 3/16” stainless Revo Cable Rail System!
On Episode 24 we build and install a strong, beautiful, and code passing cable rail system in the stairwell! This includes fabrication of the steel framework, and installation of the 3/16” stainless Revo Cable Rail System!
On Episode 25 we wrap the project up and take it to 100% complete. This involves what seems like a thousand small and large tasks, which include lots of cleaning and paint touch ups! This phase of a build is always way more work than you might think!
On Episode 25 we wrap the project up and take it to 100% complete. This involves what seems like a thousand small and large tasks, which include lots of cleaning and paint touch ups! This phase of a build is always way more work than you might think!
This video follows a contractor as they navigate the final stages of a construction project. The video focuses on the business side of things, including inspections, paperwork, and final
.. show full overview
This video follows a contractor as they navigate the final stages of a construction project. The video focuses on the business side of things, including inspections, paperwork, and final billing. The contractor shares their experience with the Certificate of Occupancy process and the challenges of ensuring all necessary paperwork is completed.
This video takes viewers on a tour of a newly completed modern mountain getaway. The homeowner, Tina, and the builder, Eric, walk through the house, highlighting unique features like the
.. show full overview
This video takes viewers on a tour of a newly completed modern mountain getaway. The homeowner, Tina, and the builder, Eric, walk through the house, highlighting unique features like the custom-built kitchen, the spacious master bathroom, and the loft bedroom. The video also showcases the exterior design, including the large windows and the use of various materials.