You need to be logged in to mark episodes as watched. Log in or sign up.
Season 2
Fredriksson Fashion introduces a new canteen, which is an automatic machine.
Fredriksson Fashion introduces a new canteen, which is an automatic machine.
A new employee is hired to increase efficiency and control production.
A new employee is hired to increase efficiency and control production.
Director Fredriksson installs a time clock to ensure that workers arrive on time.
Director Fredriksson installs a time clock to ensure that workers arrive on time.
Fredriksson tries to increase efficiency by timing the workers with a stopwatch.
Fredriksson tries to increase efficiency by timing the workers with a stopwatch.
Some of the workers at the factory bet on horse races and win.
Some of the workers at the factory bet on horse races and win.
If there are missing episodes or banners (and they exist on TheTVDB) you can request an automatic full show update: