Você precisa estar logado para marcar um episódio como visto. Entrar ou registar.
Temporada 2
A week-long mechanical marathon for the team of Queensland Rail mechanics, as they work to hoist a six-tonne V12 engine.
A week-long mechanical marathon for the team of Queensland Rail mechanics, as they work to hoist a six-tonne V12 engine.
Tensions are high at the Gilmour Space Technologies test facility on the Gold Coast, where the team prepares to put their brand new rocket through its second test.
Tensions are high at the Gilmour Space Technologies test facility on the Gold Coast, where the team prepares to put their brand new rocket through its second test.
The mechanics at Brisbane's Gallipoli Barracks's Light Horse Regiment aim to complete two huge tasks.
The mechanics at Brisbane's Gallipoli Barracks's Light Horse Regiment aim to complete two huge tasks.
South of Jindabyne, a mini hydro station has long-awaited repair work done, thanks to the arrival of a brand new submerged discharge valve.
South of Jindabyne, a mini hydro station has long-awaited repair work done, thanks to the arrival of a brand new submerged discharge valve.
One of Australia's largest hydro power stations undertakes a high stakes valve replacement; they have six hours to get the 800kg replacement part down six stories.
One of Australia's largest hydro power stations undertakes a high stakes valve replacement; they have six hours to get the 800kg replacement part down six stories.
The Kooragang Coal Terminal is buzzing with the arrival of a newly designed Ship Loading Spout and Trimmer Flap.
The Kooragang Coal Terminal is buzzing with the arrival of a newly designed Ship Loading Spout and Trimmer Flap.
In Central Queensland, the army mechanics from the 2nd/14th Light Horse Regiment have two hours to overhaul a tank suspected of hoarding unwanted debris.
In Central Queensland, the army mechanics from the 2nd/14th Light Horse Regiment have two hours to overhaul a tank suspected of hoarding unwanted debris.
The team at Murray 1, Snowy Hydro's second-largest power station, reassemble a massive power turbine after they find extensive cracking in the top cover.
The team at Murray 1, Snowy Hydro's second-largest power station, reassemble a massive power turbine after they find extensive cracking in the top cover.
The team from Lindores Construction Logistics have one day to relocate a massive tower crane on the Queens Wharf development in Brisbane.
The team from Lindores Construction Logistics have one day to relocate a massive tower crane on the Queens Wharf development in Brisbane.
In Sydney, Leichhardt Bus Depot, one of the largest in the Southern hemisphere, the team has to scramble to repair two buses before the morning rush hour.
In Sydney, Leichhardt Bus Depot, one of the largest in the Southern hemisphere, the team has to scramble to repair two buses before the morning rush hour.
Se faltam episódios ou banners (e eles existem no TheTVDB) você pode solicitar uma atualização automática :
Solicite uma atualização
Atualização solicitada