Rebuilding Tally Ho

  • Classificação #
  • Estreou: Jun 2017
  • Episódios: 224
  • Seguidores: 0
  • Em exibição
  • YouTube
  • às 0
  • Documentary

Temporadas:

Você precisa estar logado para marcar um episódio como visto. Entrar ou registar.

Temporada 3
3x1
Buying BIG Centerline Timbers
Episode overview
Exibido em:
Jan 05, 2019
This episode, I start by installing and running a new helical cutter-head in the planer thicknesser, before making a pair of oak frames with the help of some volunteers, and notching .. show full overview
3x2
New Team, New VISA, New Timber
Episode overview
Exibido em:
Jan 26, 2019
This episode, after a little work on the frames, Cecca and I take a trip to Vancouver for my VISA interview at the US consulate. When we get back to the USA Cecca has to head back home .. show full overview
3x3
Cutting The Stern Post & Some BIG Plans
Episode overview
Exibido em:
Fev 09, 2019
This episode, while the team keeps on building new frames, I make the templates for the Stern part of the Centerline, from the lofting floor. The ShipSaw gets some love and affection, .. show full overview
3x4
Big Joinery - Building The Stern Assembly
Episode overview
Exibido em:
Fev 23, 2019
The yard is full of deep snow, but we have no time to spare! Finn and I cut out all the remaining Stern Assembly pieces from the huge Purpleheart timbers, and then use power-planes, .. show full overview
3x5
Timber Boat Building & Installing Stern Assembly
Episode overview
Exibido em:
Mar 09, 2019
With the deadline of the “Frame-raising party" looming, the race is on to try and get the Stern Assembly into the boat! With a strong team now, we are able to lift most of the pieces by .. show full overview
3x6
Bolting The Stern Timbers
Episode overview
Exibido em:
Mar 23, 2019
Before the rest of the volunteers arrive, we have to get the huge timbers of the Stern Assembly bedded and fastened into the stern of Tally Ho. First we drill the holes for the bolts, .. show full overview
3x7
Frame-Raising Party
Episode overview
Exibido em:
Abr 07, 2019
After weeks of hectic preparation, we begin the big push to re-frame the stern of Tally Ho! For these 3 weeks, we have 10 people (including myself) working full-time on the boat; Kirt .. show full overview
3x8
Finishing The Stern Frames
Episode overview
Exibido em:
Abr 27, 2019
Now we enter the final week of intensive Frame Production, with the team of volunteers going at full swing to finish reframing the entire stern of TALLY HO before our deadline. Spirits .. show full overview
3x9
History Of Tally Ho (RORC Presentation)
Episode overview
Exibido em:
Mai 18, 2019
This episode is a little different from usual – it is part of my recent presentation about the Tally Ho project at the Royal Ocean Racing Club in London. In this part of the talk I .. show full overview
3x10
Leo's Story (RORC Presentaion)
Episode overview
Exibido em:
Mai 29, 2019
This week we continue with the 2nd part of the Royal Ocean Racing Club presentation. This part of the talk focuses more on my own story before I began working on Tally Ho – from spending .. show full overview
3x11
Removing Tally Ho's Stem & Bow
Episode overview
Exibido em:
Jun 08, 2019
After a holiday on a beautiful aluminium yacht in Turkey, Cecca and I head back to the US, where Tally Ho is waiting. I get two new volunteers, Joe and Jack, who start off by making .. show full overview
3x12
Cutting The Bow Timbers
Episode overview
Exibido em:
Jun 22, 2019
…in which we finish the templates for the bow assembly and cut out all the pieces with the chainsaw jig. Meanwhile, I have to deal with a damage to a power-plane, the Shipsaw, a .. show full overview
3x13
Assembling The Bow Timbers
Episode overview
Exibido em:
Jul 06, 2019
In this episode we finally dry fit the purpleheart bow assembly timbers. In other news, we come up with a short-term solution to a damaged Babbitt bearing in the Ship-saw, and we remove .. show full overview
3x14
Replacing The Bow On A Vintage Wooden Boat
Episode overview
Exibido em:
Jul 20, 2019
A worrying thunder-shake in the new stem means I have to make and install a large graving piece. After making some wedges and cutting notches in the scarph joints, we assemble the Stem, .. show full overview
3x15
Frame-Raising 2.0 & Meeting The Crew
Episode overview
Exibido em:
Ago 03, 2019
Having installed the new Stem, it’s time to replace all the frames in the bow of the boat! Eight awesome volunteers show up and we get straight to work, training them to build .. show full overview
3x16
The Life Of A Futtock & Reframing 1910 Yacht
Episode overview
Exibido em:
Ago 17, 2019
In this episode we follow the life of a single Futtock, from being marked on a template to being installed as a finished frame. Frame-raising 2.0 is going well, with more than half of .. show full overview
3x17
Finished Framing & Planking Timber
Episode overview
Exibido em:
Set 07, 2019
Tally Ho is fully re-framed! In this episode we see the final part of the frame-raising party, as we make and install the last of the frames that make up the bow of the boat. We also .. show full overview
3x18
Roughing-Out The Stem & Timber Decisions
Episode overview
Exibido em:
Set 21, 2019
After the busyness of the Frame-raising, it’s just me and the boat again for a while. I have some tough decisions to make as I look into ordering the timber for the deck-structure and .. show full overview
3x19
Shaping The Cutwater & More Timber
Episode overview
Exibido em:
Out 06, 2019
In this episode, I cut the rest of the shape of the Cutwater into the Stem, using a chainsaw. Then I plane it smooth, and shape the transition to the square stem-head with a grinder. I .. show full overview
3x20
Ship Of Theseus & Project Recap
Episode overview
Exibido em:
Out 19, 2019
In this episode, I ask the question “is Tally Ho still the same boat?” ...I explore the ancient philosophical question of The Ship of Theseus, and how that problem applies to this .. show full overview
3x21
Shaping The Keel & Adze Work
Episode overview
Exibido em:
Nov 02, 2019
In this episode, after roughing-out the starboard side Rabbet into the Stem, I make a jig to transfer the measurements for the shape of the Keel Timber from the lofting floor to the boat .. show full overview
3x22
Carving The Sternpost & Cutting The Rabbet
Episode overview
Exibido em:
Nov 16, 2019
Rowan returns to give me a hand, and we finish shaping the keel with Adze and power-plane. Then we carve some shape into the Stern Assembly, roughing out the Stern-post with a chainsaw .. show full overview
3x23
Installing The Fashion Pieces
Episode overview
Exibido em:
Dez 01, 2019
In this episode we install the Fashion Pieces, which will form the connection between the hull planking and the transom. We have to cut the heels, drill and chisel the notches in the .. show full overview
3x24 Final da Temporada
Making Beam Shelves
Episode overview
Exibido em:
Dez 21, 2019
In this episode I start by adjusting the position of some of the frames, and fairing them all on the inside. Then I cut and fit the scarph joins on the big 6-1/2” x 3” Angelique timbers. .. show full overview

Se faltam episódios ou banners (e eles existem no TheTVDB) você pode solicitar uma atualização automática :

Solicite uma atualização