Bölümleri izlendi olarak işaretlemek için oturum açman gerekiyor. Giriş yap veya kaydol.
Sezon 9
Yayınlanma tarihi
Eyl 07, 1998
In a neighborhood outside of Boston, work begins on an affordable housing unit for a person with disabilities. Included: soil decontamination and foundation excavation.
In a neighborhood outside of Boston, work begins on an affordable housing unit for a person with disabilities. Included: soil decontamination and foundation excavation.
Yayınlanma tarihi
Eyl 14, 1998
Asphalt shingles and flashing are added to the roof, and walls are prepped with special blocking for mounting safety handrails. Also: tips on paneling and working with a culturally diverse crew.
Asphalt shingles and flashing are added to the roof, and walls are prepped with special blocking for mounting safety handrails. Also: tips on paneling and working with a culturally diverse crew.
Yayınlanma tarihi
Eyl 21, 1998
A special weather- and fire-resistant siding is installed. Also: finishing the basement work and running electrical wiring.
A special weather- and fire-resistant siding is installed. Also: finishing the basement work and running electrical wiring.
Yayınlanma tarihi
Eyl 28, 1998
Insulation work is begun and trenches are dug for the new water service. Also: Boston Mayor Thomas Menino stops by to help install the front door.
Insulation work is begun and trenches are dug for the new water service. Also: Boston Mayor Thomas Menino stops by to help install the front door.
Yayınlanma tarihi
Eyl 28, 1998
Bob Vila talks with experts to understand the difference between adaptability and accessibility when designing homes for disabled people.
Bob Vila talks with experts to understand the difference between adaptability and accessibility when designing homes for disabled people.
Yayınlanma tarihi
Eki 12, 1998
The railing system is built and integrated with the front porch columns. Also: a tour of Boston's Roxbury community, making a comeback from urban blight.
The railing system is built and integrated with the front porch columns. Also: a tour of Boston's Roxbury community, making a comeback from urban blight.
Yayınlanma tarihi
Eki 19, 1998
Landscaping begins, the modular stair system is anchored, and the front porch ramp is built.
Landscaping begins, the modular stair system is anchored, and the front porch ramp is built.
Yayınlanma tarihi
Eki 26, 1998
Recessed lighting and a cost-effective tankless water heater are installed. Also: a tour of a lighting manufacturing plant.
Recessed lighting and a cost-effective tankless water heater are installed. Also: a tour of a lighting manufacturing plant.
Yayınlanma tarihi
Kas 02, 1998
Drywall goes up and plumbing begins on a shower stall designed for wheelchair users. Included: a field trip to learn about new trends in community living.
Drywall goes up and plumbing begins on a shower stall designed for wheelchair users. Included: a field trip to learn about new trends in community living.
Yayınlanma tarihi
Kas 09, 1998
The elevator is put in, and bathroom fixtures are installed along with hardware specially designed for people with disabilities.
The elevator is put in, and bathroom fixtures are installed along with hardware specially designed for people with disabilities.
Yayınlanma tarihi
Kas 16, 1998
The energy-efficient boiler is installed, and Bob Vila heads to Germany for a tour of the plant where the boiler was made.
The energy-efficient boiler is installed, and Bob Vila heads to Germany for a tour of the plant where the boiler was made.
Yayınlanma tarihi
Kas 23, 1998
A specially designed lock set is installed, along with an energy-efficient, side-by-side washer-dryer.
A specially designed lock set is installed, along with an energy-efficient, side-by-side washer-dryer.
Yayınlanma tarihi
Kas 30, 1998
Bob Vila tours the completed unit, paying special attention to the wheelchair-accessible kitchen with energy-efficient appliances.
Bob Vila tours the completed unit, paying special attention to the wheelchair-accessible kitchen with energy-efficient appliances.
Yayınlanma tarihi
Ara 07, 1998
Conversion of an old fur storage building into a residential loft begins in Boston's Leather District. Included: a walking tour of other well-preserved antique commercial buildings in the neighborhood.
Conversion of an old fur storage building into a residential loft begins in Boston's Leather District. Included: a walking tour of other well-preserved antique commercial buildings in the neighborhood.
Yayınlanma tarihi
Ara 14, 1998
Installation of plumbing and heating begins. Included: a look at the progress of Boston's famous highway project, the 'Big Dig'.
Installation of plumbing and heating begins. Included: a look at the progress of Boston's famous highway project, the 'Big Dig'.
Yayınlanma tarihi
Ara 21, 1998
Plastering is begun on the project, while Bob Vila takes a trip to Cambridge to meet a landscape architect who converted an industrial building into a spacious home and office.
Plastering is begun on the project, while Bob Vila takes a trip to Cambridge to meet a landscape architect who converted an industrial building into a spacious home and office.
Yayınlanma tarihi
Ara 28, 1998
A platform is built to raise the kitchen and bedroom above floor level. Included: a visit to a nearby finished loft.
A platform is built to raise the kitchen and bedroom above floor level. Included: a visit to a nearby finished loft.
Yayınlanma tarihi
Oca 04, 1999
The entryway and foyer are painted, and the plate glass windows are replaced throughout. Work on the bathroom begins with shower tile installation and lavatory plumbing.
The entryway and foyer are painted, and the plate glass windows are replaced throughout. Work on the bathroom begins with shower tile installation and lavatory plumbing.
Yayınlanma tarihi
Oca 11, 1999
Bob Vila addresses the challenge of framing and plastering a 48-foot wall with an almost imperceptible curve. Plus, built-in cabinets are constructed.
Bob Vila addresses the challenge of framing and plastering a 48-foot wall with an almost imperceptible curve. Plus, built-in cabinets are constructed.
Yayınlanma tarihi
Oca 18, 1999
The bathroom progresses with the installation of an electrically powered full-body shower tower, a dual-speed pressurized toilet, and a glass lavatory.
The bathroom progresses with the installation of an electrically powered full-body shower tower, a dual-speed pressurized toilet, and a glass lavatory.
Yayınlanma tarihi
Oca 25, 1999
Installation of the restaurant-style kitchen is begun, and Bob Vila tours the fabrication shop where the steel materials being used were custom-made.
Installation of the restaurant-style kitchen is begun, and Bob Vila tours the fabrication shop where the steel materials being used were custom-made.
Yayınlanma tarihi
Şub 01, 1999
Bob Vila offers tips on installing precision drywall and plastering in tricky places. Plus, a bookshelf nook is built and stainless steel appliances are installed.
Bob Vila offers tips on installing precision drywall and plastering in tricky places. Plus, a bookshelf nook is built and stainless steel appliances are installed.
Yayınlanma tarihi
Şub 08, 1999
Finishes are installed in the bathroom and elsewhere in the loft, track lighting is put in. Included: a tour of Lightolier's Tech Center to learn about the power of light to change the mood of a space.
Finishes are installed in the bathroom and elsewhere in the loft, track lighting is put in. Included: a tour of Lightolier's Tech Center to learn about the power of light to change the mood of a space.
Yayınlanma tarihi
Şub 15, 1999
Architect Greg Rochlin is on-site to oversee the fabrication of the hallway closet system-- a multicolored design pieced together in Formica laminate. Lighting designer Markus Earley
.. show full overview
Architect Greg Rochlin is on-site to oversee the fabrication of the hallway closet system-- a multicolored design pieced together in Formica laminate. Lighting designer Markus Earley returns with some snazzy fixtures and controls, and the stackable Maytag washer/dryer unit is installed in the closet.
Yayınlanma tarihi
Şub 22, 1999
Work on the restaurant-style kitchen continues, as the wire shelving system is built and the stainless steel range hood is installed.
Work on the restaurant-style kitchen continues, as the wire shelving system is built and the stainless steel range hood is installed.
Yayınlanma tarihi
Mar 01, 1999
A tour of the completed conversion project begins with the building's restored facade and ends with the sixth-floor residential loft.
A tour of the completed conversion project begins with the building's restored facade and ends with the sixth-floor residential loft.
Eğer eksik bir bölüm veya afiş varsa (ve TheTVDB üzerinde mevcutsa) dizi için güncelleme talebinde bulunabilirsin:
Dizi için güncelleme talep et
Güncelleme talebinde bulunuldu