The wet weather leads to messy muddy roads with treacherous conditions, threatening the crew's ability to haul wood to the mills. Then, Bobby has to tear out a 300-foot long beaver dam that is backing up 100 acres of wooded area.
The wet weather leads to messy muddy roads with treacherous conditions, threatening the crew's ability to haul wood to the mills. Then, Bobby has to tear out a 300-foot long beaver dam that is backing up 100 acres of wooded area.