• : 1992
  • : 256
  • : 1
  • PBS
  • Home and garden Reality

.

11
11x1
American Four-Square: Plans
Episode overview
11, 1997
Dean Johnson and Robin Hartl discuss the plans to update a classic American four-square house. They begin demolition and observe the removal of old stucco and siding. (1 of 11)
11x2
American Four-Square: Foundation
Episode overview
18, 1997
Dean Johnson and Robin Hartl finish demolition, show viewers the installation of the insulated concrete foundation, and begin framing the addition. (2 of 11)
11x3
American Four-Square: Windows
Episode overview
25, 1997
Dean Johnson and Robin Hartl finish framing the addition and begin interior walls, new windows, and show viewers how the hot-water heating is converted to a ducted HVAC system. (Part 3 of 11).
11x4
American Four-Square: Insulation and Heating
Episode overview
01, 1997
Dean Johnson and Robin Hartl insulate and install baffles in the roof. Contractors come to install the new HVAC system, and drywall is delivered for the new addition. (Part 4 of 11).
11x5
American Four-Square: Drywall
Episode overview
08, 1997
Dean Johnson and Robin Hartl have contractors hang and mud drywall. They prime walls, install ceiling beams and start on the kitchen cabinets. (Part 5 of 11).
11x6
American Four-Square: Flooring
Episode overview
15, 1997
Dean and Robin's challenge is to match new flooring and trim to what already exists in the house. They install pre-finished wood flooring, and finish the windows with custom-milled trim. (Part 6 of 11).
11x7
American Four-Square: Millwork
Episode overview
22, 1997
Dean and Robin finish up the trim details around the windows and doors. They also install the back door, get the countertops measured, and put in some cans for the recessed lights. (Part 7 of 11).
11x8
American Four-Square: Custom Cabinets
Episode overview
01, 1997
Dean and Robin visit the wood shop where the trim and custom cabinets are made. Meanwhile, the contractors progress work on the trim and cabinets, and the roofing. (Part 8 of 11).
11x9
American Four-Square: Paint and Wllcovering
Episode overview
08, 1997
The addition starts to take shape as Dean and Robin install some unique tile for the bathroom floors and walls, and bathroom and kitchen backsplashes. They also install some door hardware and get the solid surface countertops installed. (Part 9 of 11
11x10
American Four-Square: Trim-Outs
Episode overview
15, 1997
Dean and Robin wrap up the last details for this addition project. They finish appliances in the kitchen, fixtures and countertops in the bathrooms, and wallpaper and light fixtures throughout the house. (Part 10 of 11).
11x12
American Four-Square: Final Walk Through
Episode overview
09, 1997
Dean and Robin review the design and construction of the Four-Square house. Final walk-through focuses on interior finish materials, including stone, hardware, lighting, plumbing fixtures, and heat registers. (Part 11 of 11).
11x11
American Four-Square: Final Walk Through
Episode overview
06, 1997
Reviewing the design and construction. Final walk-through focuses on interior finish materials, including stone, hardware, lighting, plumbing fixtures, and heat registers. (Part 11 of 11)

Characters