Tens de ter sessão iniciada para marcar episódios como vistos. Iniciar sessão ou registar.
Temporada 15
Data de estreia
Set 29, 2016
In the Season 15 premiere, homeowners share their plan to restore and expand their early English-style Arts and Crafts home, which was built in 1909. In the second half: repairing an old
.. show full overview
In the Season 15 premiere, homeowners share their plan to restore and expand their early English-style Arts and Crafts home, which was built in 1909. In the second half: repairing an old window; and using a robotic lawnmower. Also: lead in drinking water is discussed.
Data de estreia
Out 06, 2016
Color and wallpaper ideas for the living room are contemplated; the old plaster walls are demolished; the landscape architect presents her plan; and an arborist begins removing the old
.. show full overview
Color and wallpaper ideas for the living room are contemplated; the old plaster walls are demolished; the landscape architect presents her plan; and an arborist begins removing the old silver maple. In the second half: examining fire dangers in homes; and replacing a rusty kitchen sink strainer.
Data de estreia
Out 13, 2016
Installing a steel beam; removing an oil tank; digging a new foundation; creating a bookshelf using stair treads; designing a front garden.
Installing a steel beam; removing an oil tank; digging a new foundation; creating a bookshelf using stair treads; designing a front garden.
Data de estreia
Out 20, 2016
A new foundation is built using insulated concrete forms and precast stairs; and the old foundation is reinforced and waterproofed. Also: shopping for specimen trees. In the second half:
.. show full overview
A new foundation is built using insulated concrete forms and precast stairs; and the old foundation is reinforced and waterproofed. Also: shopping for specimen trees. In the second half: replacing a cracked deck board on a front porch; and using crown molding to conceal wires during an outlet install. Also: A question about blue stains in the bathtub is answered.
Data de estreia
Out 27, 2016
The fabrication and installation of the steel beams are detailed. Also: working on the HVAC plan for the second and third floors; removing the front porch and placing new footings; and
.. show full overview
The fabrication and installation of the steel beams are detailed. Also: working on the HVAC plan for the second and third floors; removing the front porch and placing new footings; and sizing a new firebox. In the second half: replacing a water heater with a more efficient model; and starting a backyard orchard. Also: tips for circular saws.
Data de estreia
Nov 03, 2016
Work on the fireplace; and designing the kitchen. In the second half: An HVAC innovator demonstrates a new technology that could change the way homes are heated and cooled. Also: using plaster to patch drywall.
Work on the fireplace; and designing the kitchen. In the second half: An HVAC innovator demonstrates a new technology that could change the way homes are heated and cooled. Also: using plaster to patch drywall.
Data de estreia
Nov 10, 2016
A custom range hood is fabricated; and, on the roof, the chimney is built. Also: options for the first floor, including the living room panels. In the second half: A robotic wall is used
.. show full overview
A custom range hood is fabricated; and, on the roof, the chimney is built. Also: options for the first floor, including the living room panels. In the second half: A robotic wall is used in a micro-apartment; and reclaimed pine is turned into a bench.
Data de estreia
Nov 17, 2016
The new foundation is parged to match the old stucco; the new master bath-shower is drained; the electrician starts work in the new powder room; and the living room windows are replaced.
.. show full overview
The new foundation is parged to match the old stucco; the new master bath-shower is drained; the electrician starts work in the new powder room; and the living room windows are replaced. In the second half: picking an efficient washer and dryer; and fixing a three-way switch. Also: tips on table saw safety.
15x9
Arlington Arts & Crafts Arts and Crafts from Top to Bottom
Episode overview
Data de estreia
Jan 05, 2017
A new front porch is framed using custom cut pieces; a marble quarry is visited; and new color combinations for the exterior are considered. Also: fixing the original stucco panels. In
.. show full overview
A new front porch is framed using custom cut pieces; a marble quarry is visited; and new color combinations for the exterior are considered. Also: fixing the original stucco panels. In the second half: A home elevator is assembled for a young man injured in the Afghanistan War. Also: growing edible vegetable and herb seedlings.
Data de estreia
Jan 12, 2017
A new shed is built; copper is installed on the front porch; the windows are trimmed with a PVC product; and the new boiler is installed. Also: An energy-efficient home built by This Old
.. show full overview
A new shed is built; copper is installed on the front porch; the windows are trimmed with a PVC product; and the new boiler is installed. Also: An energy-efficient home built by This Old House Magazine is spotlighted. In the second half: A woodworking shop is created in a garage; and a wireless light switch is installed. Also: plumbing's memory lane
Data de estreia
Jan 19, 2017
Electrical cables are buried; porch base columns are built; kitchen cabinets are installed; and the front gable is trimmed. In the second half: A rundown walkway is revitalized with bluestone; and wire connections are discussed. Also: creating mead.
Electrical cables are buried; porch base columns are built; kitchen cabinets are installed; and the front gable is trimmed. In the second half: A rundown walkway is revitalized with bluestone; and wire connections are discussed. Also: creating mead.
Data de estreia
Jan 26, 2017
New shingles are installed; radiant tubing is installed on the first floor; the fireplace is given a makeover; and the side decks and rails are built.
New shingles are installed; radiant tubing is installed on the first floor; the fireplace is given a makeover; and the side decks and rails are built.
15x13
Arlington Arts & Crafts: Decorative Touches Make the Difference
Episode overview
Data de estreia
Fev 02, 2017
Exterior features include roof detail over a bank of windows, a refinished front door and evergreen trees along the edges of the property; lazure painting in a bedroom.
Exterior features include roof detail over a bank of windows, a refinished front door and evergreen trees along the edges of the property; lazure painting in a bedroom.
Data de estreia
Fev 09, 2017
The homeowners have chosen ship lap, the hottest wall covering right now, for the third floor. Reclaimed granite is used for steps, and a marble slab is cut for the kitchen island. A
.. show full overview
The homeowners have chosen ship lap, the hottest wall covering right now, for the third floor. Reclaimed granite is used for steps, and a marble slab is cut for the kitchen island. A cast stone mantel is built around the fireplace in the family room.
15x15
Arlington Arts & Crafts: Details Make the House Beautiful
Episode overview
Data de estreia
Fev 16, 2017
The kitchen island countertop is installed; work commences on a fieldstone wall in the front yard; wallpaper covers a new secret door in the upstairs foyer; and the finished heating, cooling and ventilation system is examined.
The kitchen island countertop is installed; work commences on a fieldstone wall in the front yard; wallpaper covers a new secret door in the upstairs foyer; and the finished heating, cooling and ventilation system is examined.
Data de estreia
Fev 23, 2017
A tour of the competed project house, including the new addition in the back; updated front hall, dining room and pantry; expanded master suite; new bathroom; and new front porch.
A tour of the competed project house, including the new addition in the back; updated front hall, dining room and pantry; expanded master suite; new bathroom; and new front porch.
Data de estreia
Mar 30, 2017
Kevin introduces the city of Detroit and describes some of its history. He meets journalist Stephen Henderson in front of his childhood home, and learns about how the city and its neighborhoods came upon hard times.
Kevin introduces the city of Detroit and describes some of its history. He meets journalist Stephen Henderson in front of his childhood home, and learns about how the city and its neighborhoods came upon hard times.
Data de estreia
Abr 06, 2017
Kevin meets Detroit’s Mayor, Mike Duggan, to learn about the city’s efforts to eliminate blight and revitalize the neighborhoods.
Kevin meets Land Bank Executive Craig Fahle, who
.. show full overview
Kevin meets Detroit’s Mayor, Mike Duggan, to learn about the city’s efforts to eliminate blight and revitalize the neighborhoods.
Kevin meets Land Bank Executive Craig Fahle, who shows him around an abandoned home in the Grandmont Rosedale neighborhood. Through a program called Rehabbed & Ready, the city plans to renovate the property and sell it to a family who plans to stay.
Data de estreia
Abr 13, 2017
At the Russell Woods project, Richard snakes a camera down the main plumbing stack to rule out any major blockages to the street.
Frank asks Tommy for help with the leaky parapet at
.. show full overview
At the Russell Woods project, Richard snakes a camera down the main plumbing stack to rule out any major blockages to the street.
Frank asks Tommy for help with the leaky parapet at the front of the house. They find the parapet is filled with dirt. After removing it all, they use a rubber roofing material to properly seal the roof and prevent further leaks.
Data de estreia
Abr 20, 2017
At the Grandmont Rosedale project, Kevin tours the demo on the house, and then meets electrician Lenny Rodriguez to learn about his electrical plan.
Back in Russell Woods, Tommy
.. show full overview
At the Grandmont Rosedale project, Kevin tours the demo on the house, and then meets electrician Lenny Rodriguez to learn about his electrical plan.
Back in Russell Woods, Tommy teaches Tamiko, Monet and Christian techniques to remove all the peeling paint in the living room.
Richard and Frank begin rough plumbing repairs in the basement using PEX tubing.
Data de estreia
Abr 27, 2017
This episode has no summary.
This episode has no summary.
Data de estreia
Mai 04, 2017
At the Grandmont Rosedale project, a new exterior wall goes up, from the inside.
In Russell Woods, Scott Caron and local electrician Shane Masters rough-in new kitchen wiring.
Richard finds Joe Burke installing a brand new HVAC system.
At the Grandmont Rosedale project, a new exterior wall goes up, from the inside.
In Russell Woods, Scott Caron and local electrician Shane Masters rough-in new kitchen wiring.
Richard finds Joe Burke installing a brand new HVAC system.
Data de estreia
Mai 11, 2017
This episode has no summary.
This episode has no summary.
Data de estreia
Mai 18, 2017
Installing leaded glass bay windows; laying down modern wood-grain tile; urban farming in Detroit; installing a drywell; installing kitchen cabinets.
Installing leaded glass bay windows; laying down modern wood-grain tile; urban farming in Detroit; installing a drywell; installing kitchen cabinets.
Data de estreia
Mai 25, 2017
Interior painting; repairing decorative molding with a putty knife; installing interior doors; revitalizing a fireplace.
Interior painting; repairing decorative molding with a putty knife; installing interior doors; revitalizing a fireplace.
Data de estreia
Jun 01, 2017
A tour of the completed house, citing both interior and exterior improvements.
A tour of the completed house, citing both interior and exterior improvements.
Se faltar algum episódio ou banner (e eles existirem no TheTVDB) podes solicitar uma atualização automática:
Pede uma actualização
Actualização pedida