Tens de ter sessão iniciada para marcar episódios como vistos. Iniciar sessão ou registar.
Temporada 1
Data de estreia
Set 03, 1990
Construction begins on a Cape Cod-style home being built in Marstons Mills, Massachusetts. Included: the lot is cleared and cement is poured for the foundation of the house.
Construction begins on a Cape Cod-style home being built in Marstons Mills, Massachusetts. Included: the lot is cleared and cement is poured for the foundation of the house.
Data de estreia
Set 10, 1990
A recycled "ell" is added,and a first-floor deck is built. Also: tips on ordering lumber.
A recycled "ell" is added,and a first-floor deck is built. Also: tips on ordering lumber.
Data de estreia
Set 17, 1990
Bob visits Barbara Gooddale in her authentic antique Cape Cod house to get a feel for the style and practicality of this design; back at our house, the crew frames, raises, and springbraces the walls.
Bob visits Barbara Gooddale in her authentic antique Cape Cod house to get a feel for the style and practicality of this design; back at our house, the crew frames, raises, and springbraces the walls.
Data de estreia
Set 24, 1990
A staircase is built and the second floor is toured. Also: Bob Vila visits a shingle plant in Delaware.
A staircase is built and the second floor is toured. Also: Bob Vila visits a shingle plant in Delaware.
Data de estreia
Out 01, 1990
Some demolition is done on the old ell to prepare it for renovation; ceiling joists and roof rafters go up in the new section of the house, and we see some rough plumbing work. Bob and Ryley discuss the budget.
Some demolition is done on the old ell to prepare it for renovation; ceiling joists and roof rafters go up in the new section of the house, and we see some rough plumbing work. Bob and Ryley discuss the budget.
Data de estreia
Out 08, 1990
A bulkhead is installed; a soffet, facia and drip edge are added to the front of the house. Also: asphalt shingles and a ridge vent.
A bulkhead is installed; a soffet, facia and drip edge are added to the front of the house. Also: asphalt shingles and a ridge vent.
Data de estreia
Out 15, 1990
The old ell is joined to the new construction, with some demolition done to make room for a shed dormer and a slider door. Bob visits the Wes-Pine wooden window factory in Hanover, Massachusetts, and comes back to install a window in our house.
The old ell is joined to the new construction, with some demolition done to make room for a shed dormer and a slider door. Bob visits the Wes-Pine wooden window factory in Hanover, Massachusetts, and comes back to install a window in our house.
Data de estreia
Out 22, 1990
Bob and Ryley install the pre-hung front door and visit Shepley Wood Products to see how it was made. Dean Fraser shows us how to apply cedar shingles, and Tom Higham demonstrates how to join copper plumbing for the bathroom lavatory.
Bob and Ryley install the pre-hung front door and visit Shepley Wood Products to see how it was made. Dean Fraser shows us how to apply cedar shingles, and Tom Higham demonstrates how to join copper plumbing for the bathroom lavatory.
Data de estreia
Out 29, 1990
Bob goes over the electrical wiring with John Hickey, cedar clapboards are put up, and Hand Cassidy explains insulation ratings. Our contractor Ryley puts exterior trim up around the windows.
Bob goes over the electrical wiring with John Hickey, cedar clapboards are put up, and Hand Cassidy explains insulation ratings. Our contractor Ryley puts exterior trim up around the windows.
Data de estreia
Nov 05, 1990
Bob discusses the kitchen layout with designer Amy O'Haire, then visits her showroom. Claude Daigle demonstrates his drywall techniques, and John Aalto talks us through the installation of the septic system.
Bob discusses the kitchen layout with designer Amy O'Haire, then visits her showroom. Claude Daigle demonstrates his drywall techniques, and John Aalto talks us through the installation of the septic system.
Data de estreia
Nov 13, 1990
Our contractor Ryley shows us how to put up the pine interior paneling in the living room; Bob checks out the furnace and ducting with installer Scott Glista, and watches John Boardman apply bathroom floor tile.
Our contractor Ryley shows us how to put up the pine interior paneling in the living room; Bob checks out the furnace and ducting with installer Scott Glista, and watches John Boardman apply bathroom floor tile.
Data de estreia
Nov 19, 1990
Artisan Terry Maiche shows us two inexpensive ways to dress up a floor with paint: spattering and stenciling. Ryley builds a bathroom vanity, and Bob talks about exterior paints and stains with painter Paul Stoliker.
Artisan Terry Maiche shows us two inexpensive ways to dress up a floor with paint: spattering and stenciling. Ryley builds a bathroom vanity, and Bob talks about exterior paints and stains with painter Paul Stoliker.
Data de estreia
Nov 26, 1990
Bob discusses landscaping with specialist Susan Hofer--sod, a gravel driveway, brickwork, fences, perennials. We tour the smart finished exterior with Ryley, and the gorgeous interior with renowned decorator Ann Hill.
Bob discusses landscaping with specialist Susan Hofer--sod, a gravel driveway, brickwork, fences, perennials. We tour the smart finished exterior with Ryley, and the gorgeous interior with renowned decorator Ann Hill.
Data de estreia
Dez 03, 1990
Now in Chicago, Bob takes a driving tour with realtor Catherine Caravette of our new neighborhood, Wicker Park, and of nearby upscale Lincoln Park. We check out our old greystone two-flat and visit a home that's been comparably renovated.
Now in Chicago, Bob takes a driving tour with realtor Catherine Caravette of our new neighborhood, Wicker Park, and of nearby upscale Lincoln Park. We check out our old greystone two-flat and visit a home that's been comparably renovated.
1x15
Two-family Greystone: Plans Discussed and Demolition Begins
Episode overview
Data de estreia
Dez 10, 1990
Bob discusses plans with local architect Bill Bauhs, and takes a tour of downtown Chicago's striking modern buildings with architectural historian Susan Benjamin. Back at our house, we meet our general contractor, Ron Gan, and begin demolition.
Bob discusses plans with local architect Bill Bauhs, and takes a tour of downtown Chicago's striking modern buildings with architectural historian Susan Benjamin. Back at our house, we meet our general contractor, Ron Gan, and begin demolition.
Data de estreia
Dez 17, 1990
Bob and Ron discuss the removal and shoring up of bearing walls, to be replaced by special engineered beams. We visit Macmillan-Bloedel's Parallam Plant in British Columbia, and plumber
.. show full overview
Bob and Ron discuss the removal and shoring up of bearing walls, to be replaced by special engineered beams. We visit Macmillan-Bloedel's Parallam Plant in British Columbia, and plumber Don McPoland shows us how water service is connected to the house.
Data de estreia
Dez 24, 1990
The crew installs a Parallam beam in the living room and iron beams in the back masonry wall. Ron Gan and Bill Bauhs talk budget and convince Bob to renovate the basement as well, so we take a visit to the Pella Window factory in Pella, Iowa.
The crew installs a Parallam beam in the living room and iron beams in the back masonry wall. Ron Gan and Bill Bauhs talk budget and convince Bob to renovate the basement as well, so we take a visit to the Pella Window factory in Pella, Iowa.
Data de estreia
Dez 31, 1990
Scott Smith's excavation crew digs out the basement to make room for a basement slab. Bob discusses heating systems for the rental units with installer Kirk Rustman, and Ron Gan explains the advantages of using metal wall studs in the kitchen.
Scott Smith's excavation crew digs out the basement to make room for a basement slab. Bob discusses heating systems for the rental units with installer Kirk Rustman, and Ron Gan explains the advantages of using metal wall studs in the kitchen.
Data de estreia
Jan 07, 1991
The concrete basement floor is poured, leveled, and screeded; our contractor Ron repairs a broken window pane the old-fashioned way, and Bob discusses the electrical layout for the first floor with electrician Slav Witowski.
The concrete basement floor is poured, leveled, and screeded; our contractor Ron repairs a broken window pane the old-fashioned way, and Bob discusses the electrical layout for the first floor with electrician Slav Witowski.
Data de estreia
Jan 14, 1991
Bob goes downtown to the Merchandise Mart to see a selection of bathroom fixtures. Back at our greystone, plumber Dan Macias replaces an old toilet and our contractor talks us through bricking in for, and installation of, a smaller bathroom window.
Bob goes downtown to the Merchandise Mart to see a selection of bathroom fixtures. Back at our greystone, plumber Dan Macias replaces an old toilet and our contractor talks us through bricking in for, and installation of, a smaller bathroom window.
Data de estreia
Jan 21, 1991
Drywall and plaster work is discussed. Also: a visit to a drywall plant in Delaware.
Drywall and plaster work is discussed. Also: a visit to a drywall plant in Delaware.
Data de estreia
Jan 28, 1991
A review of the project's budget and progress. Also: a trip to an appliance showroom, and the bathroom floor is prepped and tiled.
A review of the project's budget and progress. Also: a trip to an appliance showroom, and the bathroom floor is prepped and tiled.
Data de estreia
Fev 03, 1991
Wooden floors are refinished and new windows are installed. Also: a visit to a light-fixtures store.
Wooden floors are refinished and new windows are installed. Also: a visit to a light-fixtures store.
Data de estreia
Fev 10, 1991
Kitchen cabinets are installed and the landscaping work begins.
Kitchen cabinets are installed and the landscaping work begins.
Data de estreia
Fev 17, 1991
Installed: a basement staircase. Also: a visit to a flooring plant.
Installed: a basement staircase. Also: a visit to a flooring plant.
Data de estreia
Fev 24, 1991
Kitchen countertops are mounted. Also: a tour of the home with an interior decorator.
Kitchen countertops are mounted. Also: a tour of the home with an interior decorator.
Data de estreia
Mar 04, 1991
Bob and contractor Ron Gan look around our next projectan old deserted "coach house." Architectural historian Susan Benjamin gives us a tour of some of Chicago's 19th-century landmark buildings downtown.
Bob and contractor Ron Gan look around our next projectan old deserted "coach house." Architectural historian Susan Benjamin gives us a tour of some of Chicago's 19th-century landmark buildings downtown.
Data de estreia
Mar 11, 1991
Bob discusses plans for the coach house with our architect, Mike Morgan, and with contractor Ron Gan; demolition begins. Brick worker Dan Webb explains how the brick facade is power-washed to remove several layers of ugly paint.
Bob discusses plans for the coach house with our architect, Mike Morgan, and with contractor Ron Gan; demolition begins. Brick worker Dan Webb explains how the brick facade is power-washed to remove several layers of ugly paint.
Data de estreia
Mar 18, 1991
Bob tours architect Frank Lloyd Wright's studio and sees some houses Wright designed in Greater Chicago. Back at the coach house, the basement is excavated and steel beams are put into the back wall to make room for a garage door.
Bob tours architect Frank Lloyd Wright's studio and sees some houses Wright designed in Greater Chicago. Back at the coach house, the basement is excavated and steel beams are put into the back wall to make room for a garage door.
Data de estreia
Mar 25, 1991
General contractor Ron Gan explains how a ledger board is attached to the masonry wall to support ceiling joists. Plus, Ron and carpenter John Pringle demonstrate a simple way to build a
.. show full overview
General contractor Ron Gan explains how a ledger board is attached to the masonry wall to support ceiling joists. Plus, Ron and carpenter John Pringle demonstrate a simple way to build a set of winding stairs. Bob visits Dave Parker in Vancouver, BC to see how Parallam beams are manufactured.
Data de estreia
Abr 01, 1991
The Eagle roofing crew strips several ancient layers of old roofing, and a section of the roof is removed to make room for a new dormer. Bob explains how the dormer will provide more living space, and visits the IKO roofing shingle plant.
The Eagle roofing crew strips several ancient layers of old roofing, and a section of the roof is removed to make room for a new dormer. Bob explains how the dormer will provide more living space, and visits the IKO roofing shingle plant.
Data de estreia
Abr 08, 1991
Bob helps carpenter John Sheehan install a new vinyl window. Next, Bob takes a tour of the Republic window factory with vice-president Ron Spielman to find out how their windows are
.. show full overview
Bob helps carpenter John Sheehan install a new vinyl window. Next, Bob takes a tour of the Republic window factory with vice-president Ron Spielman to find out how their windows are made. General contractor Ron Gan shows Bob how to install a floor safe in the master bedroom.
Data de estreia
Abr 15, 1991
Bob tours the Hill Arboretum, an apartment project adapted for the physically challenged. Back at the coach house, a fireplace dealer explains the new zero-clearance fireplace and an ironmonger constructs an entryway balcony and staircase.
Bob tours the Hill Arboretum, an apartment project adapted for the physically challenged. Back at the coach house, a fireplace dealer explains the new zero-clearance fireplace and an ironmonger constructs an entryway balcony and staircase.
1x34
Coach House: Project Status, Cabinets and Whirlpool Tub Installed
Episode overview
Data de estreia
Mai 13, 1991
Bob tours the completed living room and dining room of the coach house, then reviews work done on the heating system. We see the base cabinets installed in the kitchen and a whirlpool tub installed in the master bedroom.
Bob tours the completed living room and dining room of the coach house, then reviews work done on the heating system. We see the base cabinets installed in the kitchen and a whirlpool tub installed in the master bedroom.
Data de estreia
Mai 20, 1991
Bob installs the finishing touches in the coach house kitchen, including some galvanized steel features. We go outside to plant a tree and landscape the little entryway garden, and Bob checks out the painting of the brick facade.
Bob installs the finishing touches in the coach house kitchen, including some galvanized steel features. We go outside to plant a tree and landscape the little entryway garden, and Bob checks out the painting of the brick facade.
Data de estreia
Mai 27, 1991
Bob takes the grand tour of the finished coach house exterior with Ron, our contractor. We go inside to see the decorating job that the team of Rita Miller and Bill Waggoner have done, and to watch them add a special touch to the decor.
Bob takes the grand tour of the finished coach house exterior with Ron, our contractor. We go inside to see the decorating job that the team of Rita Miller and Bill Waggoner have done, and to watch them add a special touch to the decor.
Se faltar algum episódio ou banner (e eles existirem no TheTVDB) podes solicitar uma atualização automática:
Pede uma actualização
Actualização pedida