Tens de ter sessão iniciada para marcar episódios como vistos. Iniciar sessão ou registar.
Temporada 1
Data de estreia
Jan 01, 2001
Visit RV-8 builder, un-crate aircraft and talk about tools needed.
Visit RV-8 builder, un-crate aircraft and talk about tools needed.
Data de estreia
Jan 01, 2001
Learn basic metal working techniques and assemble the tail section.
Learn basic metal working techniques and assemble the tail section.
Data de estreia
Jan 01, 2001
Build the Wings.
Build the Wings.
Data de estreia
Jan 01, 2001
Level and install the wings, and drop in on restoration project.
Level and install the wings, and drop in on restoration project.
Data de estreia
Jan 01, 2001
Install the rudder, elevator, flaps, and ailerons.
Install the rudder, elevator, flaps, and ailerons.
Data de estreia
Jan 01, 2001
Build and install cockpit parts and look inside historic cockpit from World War II.
Build and install cockpit parts and look inside historic cockpit from World War II.
Data de estreia
Jan 01, 2001
Install radio and instruments.
Install radio and instruments.
Data de estreia
Jan 01, 2001
Visit facility were engine is built, and install engine and propeller.
Visit facility were engine is built, and install engine and propeller.
Data de estreia
Jan 01, 2001
Install plumbing system and exhaust hoses, and visit home builder.
Install plumbing system and exhaust hoses, and visit home builder.
Data de estreia
Jan 01, 2001
Work with fiberglass, install the canopy and landing gear.
Work with fiberglass, install the canopy and landing gear.
Data de estreia
Jan 01, 2001
Data de estreia
Jan 01, 2001
Meet our designated air worthiness representative
and find out if we pass our inspection.
Meet our designated air worthiness representative
and find out if we pass our inspection.
Data de estreia
Jan 01, 2001
RV-8 is finished and takes to the sky!
RV-8 is finished and takes to the sky!
Se faltar algum episódio ou banner (e eles existirem no TheTVDB) podes solicitar uma atualização automática:
Pede uma actualização
Actualização pedida