Log in om afleveringen als gekeken te markeren. Inloggen of aanmelden.
Seizoen 9
Uitzenddatum
Sep 07, 1998
In a neighborhood outside of Boston, work begins on an affordable housing unit for a person with disabilities. Included: soil decontamination and foundation excavation.
In a neighborhood outside of Boston, work begins on an affordable housing unit for a person with disabilities. Included: soil decontamination and foundation excavation.
Uitzenddatum
Sep 14, 1998
Asphalt shingles and flashing are added to the roof, and walls are prepped with special blocking for mounting safety handrails. Also: tips on paneling and working with a culturally diverse crew.
Asphalt shingles and flashing are added to the roof, and walls are prepped with special blocking for mounting safety handrails. Also: tips on paneling and working with a culturally diverse crew.
Uitzenddatum
Sep 21, 1998
A special weather- and fire-resistant siding is installed. Also: finishing the basement work and running electrical wiring.
A special weather- and fire-resistant siding is installed. Also: finishing the basement work and running electrical wiring.
Uitzenddatum
Sep 28, 1998
Insulation work is begun and trenches are dug for the new water service. Also: Boston Mayor Thomas Menino stops by to help install the front door.
Insulation work is begun and trenches are dug for the new water service. Also: Boston Mayor Thomas Menino stops by to help install the front door.
Uitzenddatum
Sep 28, 1998
Bob Vila talks with experts to understand the difference between adaptability and accessibility when designing homes for disabled people.
Bob Vila talks with experts to understand the difference between adaptability and accessibility when designing homes for disabled people.
Uitzenddatum
Okt 12, 1998
The railing system is built and integrated with the front porch columns. Also: a tour of Boston's Roxbury community, making a comeback from urban blight.
The railing system is built and integrated with the front porch columns. Also: a tour of Boston's Roxbury community, making a comeback from urban blight.
Uitzenddatum
Okt 19, 1998
Landscaping begins, the modular stair system is anchored, and the front porch ramp is built.
Landscaping begins, the modular stair system is anchored, and the front porch ramp is built.
Uitzenddatum
Okt 26, 1998
Recessed lighting and a cost-effective tankless water heater are installed. Also: a tour of a lighting manufacturing plant.
Recessed lighting and a cost-effective tankless water heater are installed. Also: a tour of a lighting manufacturing plant.
Uitzenddatum
Nov 02, 1998
Drywall goes up and plumbing begins on a shower stall designed for wheelchair users. Included: a field trip to learn about new trends in community living.
Drywall goes up and plumbing begins on a shower stall designed for wheelchair users. Included: a field trip to learn about new trends in community living.
Uitzenddatum
Nov 09, 1998
The elevator is put in, and bathroom fixtures are installed along with hardware specially designed for people with disabilities.
The elevator is put in, and bathroom fixtures are installed along with hardware specially designed for people with disabilities.
Uitzenddatum
Nov 16, 1998
The energy-efficient boiler is installed, and Bob Vila heads to Germany for a tour of the plant where the boiler was made.
The energy-efficient boiler is installed, and Bob Vila heads to Germany for a tour of the plant where the boiler was made.
Uitzenddatum
Nov 23, 1998
A specially designed lock set is installed, along with an energy-efficient, side-by-side washer-dryer.
A specially designed lock set is installed, along with an energy-efficient, side-by-side washer-dryer.
Uitzenddatum
Nov 30, 1998
Bob Vila tours the completed unit, paying special attention to the wheelchair-accessible kitchen with energy-efficient appliances.
Bob Vila tours the completed unit, paying special attention to the wheelchair-accessible kitchen with energy-efficient appliances.
Uitzenddatum
Dec 07, 1998
Conversion of an old fur storage building into a residential loft begins in Boston's Leather District. Included: a walking tour of other well-preserved antique commercial buildings in the neighborhood.
Conversion of an old fur storage building into a residential loft begins in Boston's Leather District. Included: a walking tour of other well-preserved antique commercial buildings in the neighborhood.
Uitzenddatum
Dec 14, 1998
Installation of plumbing and heating begins. Included: a look at the progress of Boston's famous highway project, the 'Big Dig'.
Installation of plumbing and heating begins. Included: a look at the progress of Boston's famous highway project, the 'Big Dig'.
Uitzenddatum
Dec 21, 1998
Plastering is begun on the project, while Bob Vila takes a trip to Cambridge to meet a landscape architect who converted an industrial building into a spacious home and office.
Plastering is begun on the project, while Bob Vila takes a trip to Cambridge to meet a landscape architect who converted an industrial building into a spacious home and office.
Uitzenddatum
Dec 28, 1998
A platform is built to raise the kitchen and bedroom above floor level. Included: a visit to a nearby finished loft.
A platform is built to raise the kitchen and bedroom above floor level. Included: a visit to a nearby finished loft.
Uitzenddatum
Jan 04, 1999
The entryway and foyer are painted, and the plate glass windows are replaced throughout. Work on the bathroom begins with shower tile installation and lavatory plumbing.
The entryway and foyer are painted, and the plate glass windows are replaced throughout. Work on the bathroom begins with shower tile installation and lavatory plumbing.
Uitzenddatum
Jan 11, 1999
Bob Vila addresses the challenge of framing and plastering a 48-foot wall with an almost imperceptible curve. Plus, built-in cabinets are constructed.
Bob Vila addresses the challenge of framing and plastering a 48-foot wall with an almost imperceptible curve. Plus, built-in cabinets are constructed.
Uitzenddatum
Jan 18, 1999
The bathroom progresses with the installation of an electrically powered full-body shower tower, a dual-speed pressurized toilet, and a glass lavatory.
The bathroom progresses with the installation of an electrically powered full-body shower tower, a dual-speed pressurized toilet, and a glass lavatory.
Uitzenddatum
Jan 25, 1999
Installation of the restaurant-style kitchen is begun, and Bob Vila tours the fabrication shop where the steel materials being used were custom-made.
Installation of the restaurant-style kitchen is begun, and Bob Vila tours the fabrication shop where the steel materials being used were custom-made.
Uitzenddatum
Feb 01, 1999
Bob Vila offers tips on installing precision drywall and plastering in tricky places. Plus, a bookshelf nook is built and stainless steel appliances are installed.
Bob Vila offers tips on installing precision drywall and plastering in tricky places. Plus, a bookshelf nook is built and stainless steel appliances are installed.
Uitzenddatum
Feb 08, 1999
Finishes are installed in the bathroom and elsewhere in the loft, track lighting is put in. Included: a tour of Lightolier's Tech Center to learn about the power of light to change the mood of a space.
Finishes are installed in the bathroom and elsewhere in the loft, track lighting is put in. Included: a tour of Lightolier's Tech Center to learn about the power of light to change the mood of a space.
Uitzenddatum
Feb 15, 1999
Architect Greg Rochlin is on-site to oversee the fabrication of the hallway closet system-- a multicolored design pieced together in Formica laminate. Lighting designer Markus Earley
.. show full overview
Architect Greg Rochlin is on-site to oversee the fabrication of the hallway closet system-- a multicolored design pieced together in Formica laminate. Lighting designer Markus Earley returns with some snazzy fixtures and controls, and the stackable Maytag washer/dryer unit is installed in the closet.
Uitzenddatum
Feb 22, 1999
Work on the restaurant-style kitchen continues, as the wire shelving system is built and the stainless steel range hood is installed.
Work on the restaurant-style kitchen continues, as the wire shelving system is built and the stainless steel range hood is installed.
9x26
Seizoensfinale
Loft Conversion: Loft Conversion Final Tour
Episode overview
Uitzenddatum
Mrt 01, 1999
A tour of the completed conversion project begins with the building's restored facade and ends with the sixth-floor residential loft.
A tour of the completed conversion project begins with the building's restored facade and ends with the sixth-floor residential loft.
Als er afleveringen of banners missen (en ze staan op TheTVDB), dan kun je een automatische update van de serie aanvragen:
Update van serie aanvragen
Update aangevraagd