Devi aver effettuato l'accesso per segnare gli episodi come guardati. Accedi oppure registrati.
Stagione 11
Data di messa in onda
Gen 11, 1997
Dean Johnson and Robin Hartl discuss the plans to update a classic American four-square house. They begin demolition and observe the removal of old stucco and siding. (1 of 11)
Dean Johnson and Robin Hartl discuss the plans to update a classic American four-square house. They begin demolition and observe the removal of old stucco and siding. (1 of 11)
Data di messa in onda
Gen 18, 1997
Dean Johnson and Robin Hartl finish demolition, show viewers the installation of the insulated concrete foundation, and begin framing the addition. (2 of 11)
Dean Johnson and Robin Hartl finish demolition, show viewers the installation of the insulated concrete foundation, and begin framing the addition. (2 of 11)
Data di messa in onda
Gen 25, 1997
Dean Johnson and Robin Hartl finish framing the addition and begin interior walls, new windows, and show viewers how the hot-water heating is converted to a ducted HVAC system. (Part 3 of 11).
Dean Johnson and Robin Hartl finish framing the addition and begin interior walls, new windows, and show viewers how the hot-water heating is converted to a ducted HVAC system. (Part 3 of 11).
Data di messa in onda
Feb 01, 1997
Dean Johnson and Robin Hartl insulate and install baffles in the roof. Contractors come to install the new HVAC system, and drywall is delivered for the new addition. (Part 4 of 11).
Dean Johnson and Robin Hartl insulate and install baffles in the roof. Contractors come to install the new HVAC system, and drywall is delivered for the new addition. (Part 4 of 11).
Data di messa in onda
Feb 08, 1997
Dean Johnson and Robin Hartl have contractors hang and mud drywall. They prime walls, install ceiling beams and start on the kitchen cabinets. (Part 5 of 11).
Dean Johnson and Robin Hartl have contractors hang and mud drywall. They prime walls, install ceiling beams and start on the kitchen cabinets. (Part 5 of 11).
Data di messa in onda
Feb 15, 1997
Dean and Robin's challenge is to match new flooring and trim to what already exists in the house. They install pre-finished wood flooring, and finish the windows with custom-milled trim. (Part 6 of 11).
Dean and Robin's challenge is to match new flooring and trim to what already exists in the house. They install pre-finished wood flooring, and finish the windows with custom-milled trim. (Part 6 of 11).
Data di messa in onda
Feb 22, 1997
Dean and Robin finish up the trim details around the windows and doors. They also install the back door, get the countertops measured, and put in some cans for the recessed lights. (Part 7 of 11).
Dean and Robin finish up the trim details around the windows and doors. They also install the back door, get the countertops measured, and put in some cans for the recessed lights. (Part 7 of 11).
Data di messa in onda
Mar 01, 1997
Dean and Robin visit the wood shop where the trim and custom cabinets are made. Meanwhile, the contractors progress work on the trim and cabinets, and the roofing. (Part 8 of 11).
Dean and Robin visit the wood shop where the trim and custom cabinets are made. Meanwhile, the contractors progress work on the trim and cabinets, and the roofing. (Part 8 of 11).
Data di messa in onda
Mar 08, 1997
The addition starts to take shape as Dean and Robin install some unique tile for the bathroom floors and walls, and bathroom and kitchen backsplashes. They also install some door hardware and get the solid surface countertops installed. (Part 9 of 11
The addition starts to take shape as Dean and Robin install some unique tile for the bathroom floors and walls, and bathroom and kitchen backsplashes. They also install some door hardware and get the solid surface countertops installed. (Part 9 of 11
Data di messa in onda
Mar 15, 1997
Dean and Robin wrap up the last details for this addition project. They finish appliances in the kitchen, fixtures and countertops in the bathrooms, and wallpaper and light fixtures throughout the house. (Part 10 of 11).
Dean and Robin wrap up the last details for this addition project. They finish appliances in the kitchen, fixtures and countertops in the bathrooms, and wallpaper and light fixtures throughout the house. (Part 10 of 11).
11x12
Ultimo episodio della stagione
American Four-Square: Final Walk Through
Episode overview
Data di messa in onda
Giu 09, 1997
Dean and Robin review the design and construction of the Four-Square house. Final walk-through focuses on interior finish materials, including stone, hardware, lighting, plumbing fixtures, and heat registers. (Part 11 of 11).
Dean and Robin review the design and construction of the Four-Square house. Final walk-through focuses on interior finish materials, including stone, hardware, lighting, plumbing fixtures, and heat registers. (Part 11 of 11).
Data di messa in onda
Set 06, 1997
Reviewing the design and construction. Final walk-through focuses on interior finish materials, including stone, hardware, lighting, plumbing fixtures, and heat registers. (Part 11 of 11)
Reviewing the design and construction. Final walk-through focuses on interior finish materials, including stone, hardware, lighting, plumbing fixtures, and heat registers. (Part 11 of 11)
Se ci sono degli episodi e dei banner mancanti (e esistono su TheTVDB) puoi richiedere un aggiornamento automatico dell'intera serie:
Richiedi aggiornamento della serie
Aggiornamento richiesto