Necesita iniciar sesión para marcar los episodios como vistos. Iniciar Sesión o registrarse.
Temporada 24
Fecha de emisión
Feb 06, 2010
The Hometime crew uses pavers and retaining walls to capture space under a second-story deck.
The Hometime crew uses pavers and retaining walls to capture space under a second-story deck.
Fecha de emisión
Feb 13, 2010
The Hometime crew frames and insulates curtain walls to enclose the space under a second-story deck.
The Hometime crew frames and insulates curtain walls to enclose the space under a second-story deck.
Fecha de emisión
Feb 20, 2010
The Hometime crew finishes the space under a second-story deck to expand a workshop used to create metal sculpture.
The Hometime crew finishes the space under a second-story deck to expand a workshop used to create metal sculpture.
Fecha de emisión
Feb 27, 2010
The Hometime crew works with surveyors, graders and architects to prepare a building site. Episode one of a thirty part series focusing on this well-designed, state-of-the-art home.
The Hometime crew works with surveyors, graders and architects to prepare a building site. Episode one of a thirty part series focusing on this well-designed, state-of-the-art home.
Fecha de emisión
Mar 06, 2010
The Hometime crew works with a contractor to excavate for the new house and use poured-in-place insulating concrete forms for the basement walls.
The Hometime crew works with a contractor to excavate for the new house and use poured-in-place insulating concrete forms for the basement walls.
Fecha de emisión
Mar 13, 2010
The Hometime crew helps out as the floors and walls of the house are pre-built in a nearby factory and then quickly assembled at the job site on top of the foundation.
The Hometime crew helps out as the floors and walls of the house are pre-built in a nearby factory and then quickly assembled at the job site on top of the foundation.
Fecha de emisión
Mar 20, 2010
The Hometime crew watches as the intricate roof framing components for the house are pre-built off-site, assembled on the ground, and finally hoisted into place.
The Hometime crew watches as the intricate roof framing components for the house are pre-built off-site, assembled on the ground, and finally hoisted into place.
Fecha de emisión
Mar 27, 2010
The Hometime crew supervises the design, construction and installation of the windows for the home, and explains the natural slate roofing system.
The Hometime crew supervises the design, construction and installation of the windows for the home, and explains the natural slate roofing system.
Fecha de emisión
Abr 03, 2010
The Hometime crew prepares for and supervises the installation of the basement, garage and porch floors.
The Hometime crew prepares for and supervises the installation of the basement, garage and porch floors.
Fecha de emisión
Abr 10, 2010
The Hometime crew manages the installation of the ductwork, recessed lighting, and central vacuum while also helping out with the driveway, stonework and siding.
The Hometime crew manages the installation of the ductwork, recessed lighting, and central vacuum while also helping out with the driveway, stonework and siding.
Fecha de emisión
Abr 17, 2010
The Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation.
The Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation.
Fecha de emisión
Abr 24, 2010
The Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment.
The Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment.
Fecha de emisión
Sept 11, 2010
The Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for "him."
The Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for "him."
Fecha de emisión
Sept 18, 2010
After some last-minute preparation crews install four different types of wall board for the interior walls and ceilings.
After some last-minute preparation crews install four different types of wall board for the interior walls and ceilings.
Fecha de emisión
Sept 25, 2010
The project house gets sheathing for the floors, extra-tough primer on the walls, and a stained-cedar vaulted ceiling in three high-profile rooms.
The project house gets sheathing for the floors, extra-tough primer on the walls, and a stained-cedar vaulted ceiling in three high-profile rooms.
Fecha de emisión
Oct 02, 2010
Wooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed.
Wooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed.
Fecha de emisión
Oct 09, 2010
The Hometime crews scopes out how the custom matching garage and entry doors are made, and helps out leveling the floors for tiling.
The Hometime crews scopes out how the custom matching garage and entry doors are made, and helps out leveling the floors for tiling.
Fecha de emisión
Oct 16, 2010
The Hometime crew helps out as craftsmen install ceramic and natural stone tile in the bathrooms, natural stone on the fireplace, and natural stone for the retaining walls.
The Hometime crew helps out as craftsmen install ceramic and natural stone tile in the bathrooms, natural stone on the fireplace, and natural stone for the retaining walls.
Fecha de emisión
Oct 23, 2010
The Hometime crew installs the paver driveway, as well as the master bathroom cabinets.
The Hometime crew installs the paver driveway, as well as the master bathroom cabinets.
Fecha de emisión
Oct 30, 2010
The Hometime crew works on the interior doors, kitchen cabinets, wainscoting, and exterior columns.
The Hometime crew works on the interior doors, kitchen cabinets, wainscoting, and exterior columns.
Fecha de emisión
Nov 06, 2010
The Hometime crew installs custom cabinets for the laundry room and starts the home’s wood flooring.
The Hometime crew installs custom cabinets for the laundry room and starts the home’s wood flooring.
Fecha de emisión
Nov 13, 2010
The home office begins to take shape, as the custom staircase work begins.
The home office begins to take shape, as the custom staircase work begins.
Fecha de emisión
Nov 20, 2010
The stone countertops are fabricated and installed.
The stone countertops are fabricated and installed.
Fecha de emisión
Nov 27, 2010
The Hometime crew installs cabinets, countertops and landscaping.
The Hometime crew installs cabinets, countertops and landscaping.
Fecha de emisión
Ene 22, 2011
The covered porch gets motorized screens, the garage floor gets an epoxy coating, and the last few cabinets are installed.
The covered porch gets motorized screens, the garage floor gets an epoxy coating, and the last few cabinets are installed.
Fecha de emisión
Ene 29, 2011
The custom handrail is built, granite countertops are installed, the drip irrigation is wrapped up, and the yard gets sod.
The custom handrail is built, granite countertops are installed, the drip irrigation is wrapped up, and the yard gets sod.
Si hay episodios o banners que faltan (y existen en TheTVDB) puede solicitar una actualización completa del programa:
Solicitar actualización del programa
Solicitar Actualización