Necesita iniciar sesión para marcar los episodios como vistos. Iniciar Sesión o registrarse.
Temporada 8
Fecha de emisión
Sept 01, 1997
A vintage Sears kit house is restored, but historic and sentimental elements are preserved.
A vintage Sears kit house is restored, but historic and sentimental elements are preserved.
Fecha de emisión
Sept 08, 1997
A closet is transformed into a bathroom, while new and old building materials are blended in the living and dining rooms.
A closet is transformed into a bathroom, while new and old building materials are blended in the living and dining rooms.
Fecha de emisión
Sept 15, 1997
Bob Vila oversees the reconditioning of an original window in the Sears kit house. Also: a tour of Frank Lloyd Wright's Hollyhock House.
Bob Vila oversees the reconditioning of an original window in the Sears kit house. Also: a tour of Frank Lloyd Wright's Hollyhock House.
Fecha de emisión
Sept 22, 1997
Interior trim details are custom-milled as per the architect's specifications, and original bathroom fixtures are re-porcelainized. Also: framing continues on the back porch.
Interior trim details are custom-milled as per the architect's specifications, and original bathroom fixtures are re-porcelainized. Also: framing continues on the back porch.
Fecha de emisión
Sept 29, 1997
Vintage cabinetry is discovered in a salvage yard and installed in the kitchen; yellow paint is stripped off; and the facade is given a facelift.
Vintage cabinetry is discovered in a salvage yard and installed in the kitchen; yellow paint is stripped off; and the facade is given a facelift.
Fecha de emisión
Oct 06, 1997
The pool crew finishes the rebar and sprays gunnite, while French doors are installed in the master bedroom and the porch roof is repaired.
The pool crew finishes the rebar and sprays gunnite, while French doors are installed in the master bedroom and the porch roof is repaired.
Fecha de emisión
Oct 13, 1997
Green Indian slate is installed on the surround and porch steps. Also: the backyard entry gate is finished.
Green Indian slate is installed on the surround and porch steps. Also: the backyard entry gate is finished.
Fecha de emisión
Oct 20, 1997
At the Sears kit house, the exterior is stripped for priming and painting. Also: a tour of the CBS studio center.
At the Sears kit house, the exterior is stripped for priming and painting. Also: a tour of the CBS studio center.
Fecha de emisión
Oct 27, 1997
The bathroom is tiled, new kitchen cabinets are custom-made to match the vintage ones, and decking is installed on the back porch.
The bathroom is tiled, new kitchen cabinets are custom-made to match the vintage ones, and decking is installed on the back porch.
Fecha de emisión
Nov 03, 1997
The electrician installs back lighting in the living room, and six stained-glass panels are cut and assembled. Meanwhile, contractors insulate the roof.
The electrician installs back lighting in the living room, and six stained-glass panels are cut and assembled. Meanwhile, contractors insulate the roof.
Fecha de emisión
Nov 10, 1997
A cabinetmaker frames boxes for living-room built-ins to match existing ones in the kitchen, and the pool crew finishes the plaster.
A cabinetmaker frames boxes for living-room built-ins to match existing ones in the kitchen, and the pool crew finishes the plaster.
Fecha de emisión
Nov 17, 1997
Damaged hardwood flooring is repaired and an alder kitchen countertop is installed. Also: a tour of the Japanese Garden at Huntington Library and tips on building a Zen garden.
Damaged hardwood flooring is repaired and an alder kitchen countertop is installed. Also: a tour of the Japanese Garden at Huntington Library and tips on building a Zen garden.
Fecha de emisión
Nov 24, 1997
Bob Vila leads a final tour of the landscaped front yard and the porch addition, which features a barbecue. Also toured are the Zen garden and swimming pool.
Bob Vila leads a final tour of the landscaped front yard and the porch addition, which features a barbecue. Also toured are the Zen garden and swimming pool.
Fecha de emisión
Dic 01, 1997
Plans for a post-and-beam garage and boat storage project are discussed with an architect. Also: touring a marina with America's Cup champ Bill Koch.
Plans for a post-and-beam garage and boat storage project are discussed with an architect. Also: touring a marina with America's Cup champ Bill Koch.
Fecha de emisión
Dic 08, 1997
Foundation work is begun, while Bob Vila tours an antique car museum in a Shaker-style round barn in Sandwich, MA.
Foundation work is begun, while Bob Vila tours an antique car museum in a Shaker-style round barn in Sandwich, MA.
Fecha de emisión
Dic 15, 1997
As the foundation is prepared, Bob Vila explains termite-proofing and oversees the installation of a hydronic heating system.
As the foundation is prepared, Bob Vila explains termite-proofing and oversees the installation of a hydronic heating system.
Fecha de emisión
Dic 22, 1997
A look at framing, and the special techniques and tools that are used for it. Also: a tour of a lumber company examines pre-cut materials for the post-and-beam plan.
A look at framing, and the special techniques and tools that are used for it. Also: a tour of a lumber company examines pre-cut materials for the post-and-beam plan.
Fecha de emisión
Dic 29, 1997
New decking is installed in the loft, while Bob Vila and the crew put up the ridge beam and rafters. Also: a joinery specialist demonstrates house framing.
New decking is installed in the loft, while Bob Vila and the crew put up the ridge beam and rafters. Also: a joinery specialist demonstrates house framing.
Fecha de emisión
Ene 05, 1998
Insulation panels are installed and Bob Vila visits a factory where all-in-one wall product is made.
Insulation panels are installed and Bob Vila visits a factory where all-in-one wall product is made.
Fecha de emisión
Ene 12, 1998
Windows, exterior trim and siding are installed. Also: a tour of the American Plywood Association lab, where quality testing is observed.
Windows, exterior trim and siding are installed. Also: a tour of the American Plywood Association lab, where quality testing is observed.
Fecha de emisión
Ene 19, 1998
Metal roofing is installed and drywall is put up around the skylights.
Metal roofing is installed and drywall is put up around the skylights.
Fecha de emisión
Ene 26, 1998
Bob Vila takes a look at such safety features as motion detectors, a fire-suppression unit and a lightning rod.
Bob Vila takes a look at such safety features as motion detectors, a fire-suppression unit and a lightning rod.
Fecha de emisión
Feb 02, 1998
A horticulturalist shares general landscaping tips and offers special advice on the use of native plants and trees. Also: building a staircase to the loft.
A horticulturalist shares general landscaping tips and offers special advice on the use of native plants and trees. Also: building a staircase to the loft.
Fecha de emisión
Feb 09, 1998
A garage-door opener is installed, the heated-floor system is activated, and interior paneling is stained. Also: track lighting goes in.
A garage-door opener is installed, the heated-floor system is activated, and interior paneling is stained. Also: track lighting goes in.
Fecha de emisión
Feb 16, 1998
The interior of the barn is stained and a workshop is assembled. Also: race-car driver Lyn St. James helps Bob Vila set up the automotive garage with new tools.
The interior of the barn is stained and a workshop is assembled. Also: race-car driver Lyn St. James helps Bob Vila set up the automotive garage with new tools.
Fecha de emisión
Feb 23, 1998
Workbenches are completed and metal shelves are installed in the loft, before Bob Vila leads a tour of the finished barn.
Workbenches are completed and metal shelves are installed in the loft, before Bob Vila leads a tour of the finished barn.
Si hay episodios o banners que faltan (y existen en TheTVDB) puede solicitar una actualización completa del programa:
Solicitar actualización del programa
Solicitar Actualización