Necesita iniciar sesión para marcar los episodios como vistos. Iniciar Sesión o registrarse.
Temporada 1
Fecha de emisión
Sept 01, 2002
Starting the series, Mark decides on the helicopter to build and takes a tour of their factory.
Starting the series, Mark decides on the helicopter to build and takes a tour of their factory.
Fecha de emisión
Sept 02, 2002
The kit arrives!
Mark examines the kit and goes over the contents. The assembly start out with the skids and then moves to the frame and tail boom.
The kit arrives!
Mark examines the kit and goes over the contents. The assembly start out with the skids and then moves to the frame and tail boom.
Fecha de emisión
Sept 03, 2002
Mounting the trim fins and the tail rotor. Also a demonstration of a pre-flight.
Mounting the trim fins and the tail rotor. Also a demonstration of a pre-flight.
Fecha de emisión
Sept 04, 2002
Avid aviator Mark Evans turns his attention to the main rotor shaft, while his flight training covers the controls and throttle
Avid aviator Mark Evans turns his attention to the main rotor shaft, while his flight training covers the controls and throttle
Fecha de emisión
Sept 05, 2002
Mark installs the engine in his home kit helicopter; countering typical mistakes made by beginner pilots.
Mark installs the engine in his home kit helicopter; countering typical mistakes made by beginner pilots.
Fecha de emisión
Sept 06, 2002
Flight training lessons offer Mark Evans the chance to learn how to deal with engine failure and autorotation
Flight training lessons offer Mark Evans the chance to learn how to deal with engine failure and autorotation
Fecha de emisión
Sept 07, 2002
Mark Evans learns to take off from both the ground and a hover position, and the exhaust and cooling systems are installed in his helicopter
Mark Evans learns to take off from both the ground and a hover position, and the exhaust and cooling systems are installed in his helicopter
Fecha de emisión
Sept 08, 2002
Mark fits the muffler and installs the fuel system, pressure regulator and all the hoses into his home kit helicopter.
Mark fits the muffler and installs the fuel system, pressure regulator and all the hoses into his home kit helicopter.
Fecha de emisión
Sept 09, 2002
Installing the instrument cluster. Also in this episode is a visit by a RAF Search And Rescue helicopter and crew. The SAR crew takes us for a tour of their Sea King helicopter.
Installing the instrument cluster. Also in this episode is a visit by a RAF Search And Rescue helicopter and crew. The SAR crew takes us for a tour of their Sea King helicopter.
Fecha de emisión
Sept 10, 2002
Calibrating the fuel gauge and installing the last of the gauges. The instrument cluster is then installed in the airframe. Testing the engine and matching the engine control computer
.. show full overview
Calibrating the fuel gauge and installing the last of the gauges. The instrument cluster is then installed in the airframe. Testing the engine and matching the engine control computer to the engine. The engine is wired up and the lights are installed. The bodywork is started as well.
Fecha de emisión
Sept 11, 2002
The seats are fitted while Mark Evans turns his attention to the body panel of the home-made helicopter
The seats are fitted while Mark Evans turns his attention to the body panel of the home-made helicopter
Fecha de emisión
Sept 12, 2002
Mark Evans fits the main rotor blades and gets to grips with taxiing during his helicopter flight training session
Mark Evans fits the main rotor blades and gets to grips with taxiing during his helicopter flight training session
Fecha de emisión
Sept 13, 2002
Mark Evans practises the quick stop, and installs the rigging into his homemade helicopter
Mark Evans practises the quick stop, and installs the rigging into his homemade helicopter
Fecha de emisión
Sept 14, 2002
The upholstery of the home kit helicopter is installed, and Mark Evans paints the bodywork as his project nears completion
The upholstery of the home kit helicopter is installed, and Mark Evans paints the bodywork as his project nears completion
Fecha de emisión
Sept 15, 2002
Avid aviator Mark Evans reveals the complete helicopter and takes it up into the skies for its first flight
Avid aviator Mark Evans reveals the complete helicopter and takes it up into the skies for its first flight
Si hay episodios o banners que faltan (y existen en TheTVDB) puede solicitar una actualización completa del programa:
Solicitar actualización del programa
Solicitar Actualización