Helden der Baustelle

A pylon takes off (3x18)


Air date: Oct 24, 2022

Project manager Karl-Heinz Weiss and his work colleagues are under time pressure in the district of Regensburg. There, the A3 was closed overnight at the Rosenhof junction so that the men can build a concrete formwork for a new bridge. Beams 20 meters long are being assembled above the highway. This is a job for experienced professionals. Belmin and Josef Husetovic release the elements from the crane at a height of twelve meters and position them with centimeter precision. In the dark, father and son have to rely on each other almost blindly. (Text: DMAX)

  • Rank #
  • Premiered: Dec 2019
  • Episodes: 50
  • Followers: 0
  • Running
  • DMAX (DE)
  • Monday at 18