Helden der Baustelle

Giant faucet on the road (3x12)


Air date: Oct 18, 2022

his has never happened before in Germany: The eastern section of the Gumpenbach Bridge near Kornwestheim is being moved, including piers and foundations. Caroline Heß, who is only 29 years old, has a great responsibility in the adverse weather conditions. In Herdecke, meanwhile, the pumped storage power plant is being renovated. Full concentration is required when transporting a 180-ton spherical valve that regulates the water inflow. And protective gates up to seven meters wide are to protect an 18-story wooden house in Hamburg from storm surges. (Text: DMAX)

  • Rank #
  • Premiered: Dec 2019
  • Episodes: 50
  • Followers: 0
  • Running
  • DMAX (DE)
  • Monday at 18