Insiders Project

Top of Kiev's South Bridge (English Subtitled) (1x3)


Air date: Feb 23, 2018

The shooting crew follows through the internal constructions of the South Bridge. Having passed the whole bridge inside, the team goes up vertical cables 300 meters long. A hand-made construction for ascent, strong arms and self-confidence - these are the only things the team relies on. Throwing a climbing hook with a rope, the shooting crew gets to the peak using a hand-made ladder.

  • Rank #
  • Premiered: Feb 2018
  • Episodes: 10
  • Followers: 0
  • Ended
  • Unknown
  • at 0