Rebuilding Tally Ho

Rebuilding Tally Ho

Lead-Pouring Disaster (5x16)


Air date: Jul 04, 2021

In this episode we attempt to slightly enlarge the lead ballast keel by pouring a layer of molten lead on top of it. Before we actually pour I discuss the reasons for doing this and we fabricate a large “pig” to melt the lead in. Unfortunately when we actually pour the molten lead things do not go as planned! ….and now I’m left with a very difficult decision.

  • Rank #
  • Premiered: Jun 2017
  • Episodes: 238
  • Followers: 0
  • Running
  • YouTube
  • at 0