The Art Of Boat Building

The Art Of Boat Building

Installing Floor, Aft Deck Beams & Locker Floor (2x39)


Air date: Jan 23, 2021

In this episode (S2-E39) of The Art of Boat Building the Haven 12 1/2 has it's interior primed readying for bilge paint. Bob Emser, boat builder starts by installing the floor beams followed by the aft deck beams and the aft locker floor. He then begins painting the bilge with TotalBilge by total boat.

  • Rank #
  • Premiered: Jul 2018
  • Episodes: 132
  • Followers: 0
  • Running
  • YouTube
  • at 0