Then & Now
Keeping London Moving: London Transport (1x5)
Season finale
Air date: Oct 29, 2019
The series concludes with a look at the origins of the Routemaster bus, which was engineered from Second World War aircraft technology, and a look behind the scenes in the control centre that keeps transport in London running. Plus, a look back at the Kings Cross tube disaster and a look at a project that would have seen London divided by four giant motorways.
- Premiered: Oct 2019
- Episodes: 7
- Followers: 2
- Ended
- Channel 5
- Tuesday at 20