Du skal være logget ind for at markere afsnit som set. Log på eller tilmelding.
Sæsoner 11
Udgivelsesdato
Okt 04, 2012
Season 11 opens in Cambridge, Mass., where the conversion of an 1887 Victorian-era two-family house into a single-family home commences. A look at the yard turns up a few surprises; an
.. show full overview
Season 11 opens in Cambridge, Mass., where the conversion of an 1887 Victorian-era two-family house into a single-family home commences. A look at the yard turns up a few surprises; an energy audit reveals the need for efficiency upgrades; and a deconstruction expert is brought in to help with the removal of old and unneeded house parts. Also: how to customize stock shelving; and install a new washing-machine valve.
Udgivelsesdato
Okt 11, 2012
A chimney is removed brick-by-brick so that the bricks can be used on another job; a sick Norway maple is removed; an eco-resale store in Springfield, Mass., is visited. Also: installing
.. show full overview
A chimney is removed brick-by-brick so that the bricks can be used on another job; a sick Norway maple is removed; an eco-resale store in Springfield, Mass., is visited. Also: installing a bluestone patio in a backyard; adding a bike rack to a garage.
Udgivelsesdato
Okt 18, 2012
A load-bearing partition wall is relocated; a dip is removed from the floor; appropriate colors for outside the house are discussed. In the second half: building a custom fireplace mantel; garden edging; repairing a leaky kitchen faucet.
A load-bearing partition wall is relocated; a dip is removed from the floor; appropriate colors for outside the house are discussed. In the second half: building a custom fireplace mantel; garden edging; repairing a leaky kitchen faucet.
Udgivelsesdato
Okt 25, 2012
The crew begins work on the first-floor ceiling; a skylight is added to the master suite. In the second half: laying sod in a yard; measuring without doing math; installing a wireless thermostat to control a heating system.
The crew begins work on the first-floor ceiling; a skylight is added to the master suite. In the second half: laying sod in a yard; measuring without doing math; installing a wireless thermostat to control a heating system.
Udgivelsesdato
Nov 01, 2012
Kevin O'Connor bikes to work on a vintage bicycle; how the steps to the roof deck were removed. Also: tackling the stump left from the old maple; keeping the ducts out of the roof rafter
.. show full overview
Kevin O'Connor bikes to work on a vintage bicycle; how the steps to the roof deck were removed. Also: tackling the stump left from the old maple; keeping the ducts out of the roof rafter bays in order to save space for insulation; hiding the air handler in a hall closet. In the second half: planting palm trees; replacing an old heating system-hot water heater with a single, more efficient unit.
Udgivelsesdato
Nov 08, 2012
Repointing the foundation; repairing the front porch; rebuilding a porch railing; detailing the fire blocking and fire caulking. Also: the Community Rowing organization of Massachusetts,
.. show full overview
Repointing the foundation; repairing the front porch; rebuilding a porch railing; detailing the fire blocking and fire caulking. Also: the Community Rowing organization of Massachusetts, which makes rowing on the Charles River available to everyone. In the second half: a visit to New York highlights a scale model of the city in Queens; and shows how to install task lighting in a dark kitchen and add a cable-railing system to a deck.
I tilfælde af manglende afsnit eller bannere (og de findes på TheTVDB) kan du forespørge en automatisk fuld opdatering af serien:
Forespørg opdatering af serie
Opdatering anmodet