Timberborners

Engineering an ADJUSTABLE SUPER DAM to survive long dry seasons in Timberborn! (1x7)


Exibido em:: Out 01, 2021

We're back in part 7 of the Timberborn full release, continuing our playthrough with the new Iron Teeth faction and building a perfectly engineered beaver city. This time we create a super dam capable of getting us through the longest of dry seasons!

  • Classificação #
  • Estreou: Set 2021
  • Episódios: 140
  • Seguidores: 0
  • Em exibição
  • YouTube
  • às 0