This Old House

This Old House

Lexington Project 2015: Part 7: Inspections (36x15)


Yayınlanma tarihi: Şub 14, 2015

Rough mechanical and rough framing inspections are discussed; reinforced fiberglass columns to support the farmer's porch are installed; how an arched doorway is being turned into one that's squared off; and the storm window system being using to enclose the screen porch is spotlighted.

  • Prömiyeri: Oca 1979
  • Bölümler: 1204
  • Takipçiler: 80
  • Devam eden
  • PBS
  • Perşembe saat 20