This Old House
Lexington Project 2015: Part 7: Inspections (36x15)
Yayınlanma tarihi: Şub 14, 2015
Rough mechanical and rough framing inspections are discussed; reinforced fiberglass columns to support the farmer's porch are installed; how an arched doorway is being turned into one that's squared off; and the storm window system being using to enclose the screen porch is spotlighted.
- Prömiyeri: Oca 1979
- Bölümler: 1204
- Takipçiler: 80
- Devam eden
- PBS
- Perşembe saat 20