Practical Engineering

Practical Engineering

How This Bridge Was Rebuilt in 15 Days After Hurricane Ian (2022x23)

Sezon finali

Yayınlanma tarihi: Ara 20, 2022

The Sanibel Causeway was rendered completely impassable to vehicles. Less than a month later, it was open to traffic.

  • Derece #
  • Prömiyeri: Eki 2014
  • Bölümler: 207
  • Takipçiler: 0
  • Devam eden
  • YouTube
  • saat 0