Rebuilding Tally Ho

Rebuilding Tally Ho

Lead-Pouring Disaster (5x16)


Yayınlanma tarihi: Tem 04, 2021

In this episode we attempt to slightly enlarge the lead ballast keel by pouring a layer of molten lead on top of it. Before we actually pour I discuss the reasons for doing this and we fabricate a large “pig” to melt the lead in. Unfortunately when we actually pour the molten lead things do not go as planned! ….and now I’m left with a very difficult decision.

  • Derece #
  • Prömiyeri: Haz 2017
  • Bölümler: 236
  • Takipçiler: 0
  • Devam eden
  • YouTube
  • saat 0