Rebuilding Tally Ho
Lead-Pouring Disaster (5x16)
Yayınlanma tarihi: Tem 04, 2021
In this episode we attempt to slightly enlarge the lead ballast keel by pouring a layer of molten lead on top of it. Before we actually pour I discuss the reasons for doing this and we fabricate a large “pig” to melt the lead in.
Unfortunately when we actually pour the molten lead things do not go as planned! ….and now I’m left with a very difficult decision.
- Prömiyeri: Haz 2017
- Bölümler: 236
- Takipçiler: 0
- Devam eden
- YouTube
- saat 0