Building Alaska
Moving on to Plan X-ray (9x3)
:
Josh and his team begin work on the interior walls and install the second-story floor joists in their Cordova cabin. At Trinity Lake, Chris must adapt when he runs out of lumber to build a dock and the framers he hired don't show up. Finally, wrong cuts and measurements threaten to put John and Heather further behind than ever on their Mt. Ascension build.