The This Old House Hour
It's Foundation Time (14x5)
:
Work on the mudroom foundation begins; the insulation in the attic is removed; and a door is resized to fit a smaller opening. Also: dream-kitchen cabinets. In the second half: creating soil from organic garbage; and determining why a steam boiler is losing water.