The This Old House Hour

The This Old House Hour

Bedford Project (10x8)


:

The last of the structural work is completed; the restored historic window sashes are reinstalled; the electrical service in the garage is upgraded. Also: how the study's modern narrow strip flooring is being removed in order to show the more historic wide pine boards underneath. In the second half: fixing a kitchen sink drain; quieting squeaky hardwood floors.

  • :
  • : 189
  • : 12
  • PBS
  • 8