Frank & Kastaniegaarden
Erection at Kastanjegården (23x14)
:
Then today it will be seen if all ends fit into the big wind turbine project. The bottom structure must be assembled and hoisted into place. It requires manpower, accuracy and a giant crane. And then a ruffled wet hen conceals as many as 5 surprises.