Practical Engineering

Practical Engineering

How This Bridge Was Rebuilt in 15 Days After Hurricane Ian (2022x23)


: 20, 2022

The Sanibel Causeway was rendered completely impassable to vehicles. Less than a month later, it was open to traffic.

  • : 2014
  • : 206
  • : 0
  • YouTube
  • 0