Ground Force
Brotherton (8x6)
: 18, 2002
In the last episode of the series, the team are challenged to revamp a plot at Lyndale Residential Caravan Site. They set about building a veranda and creating a water feature using copper piping, but the terrible weather and poor soil make progress very difficult leaving them staring defeat in the face.