Paddington Station 24/7

Paddington Station 24/7

Episode 8 (3x8)


: 05, 2018

The bank holiday works schedule is disrupted when a trespassers is o the line outside of London, forcing the cancellation of all trains. However, the shutdown allows the engineers onto the track to renew large sections of the rail infrastructure.

  • : 2017
  • : 40
  • : 14
  • Channel 5
  • 21