This Old House

This Old House

Essex 2012/13 Part 7: Rustic Plaster, Advanced Septic (34x22)


Data emisji: Lut 28, 2013

Inside our Essex cottage, insulation is in and drywall is going up. Tom shows Kevin the progress and they meet drywall installer Brian Jones to see his method for boarding ceilings using a panel lift and scaffolding for the high cathedral ceiling in the kitchen. Upstairs, the plastering is well underway. Tom shows Kevin the rustic/Old World effect the homeowners want and how plastering contractor Bob Bucco achieves it using rounded corners and the rough/base coat plaster as the finish coat. At a third-party testing facility in Falmouth, MA, Richard meets George Heufelder for a brief history of septic innovation and a look at new technology that is on the horizon, and already here. One of them uses "membrane bioreactor" technology, and we're going to try it out in Essex. George's group approved the system, and it is a true leap forward in wastewater treatment. Back at our house, manufacturer Ingo Schaefer helps show Kevin how it works. We got the septic in before the cold weather, and now Roger is trying to do the same for the hardscaping. He shows Kevin the decorative bands that will make up the border for the (future) asphalt parking court, with granite strips and cobbles making up the pattern. Back inside, Norm brings out the decorative timbers that must go up in the kitchen before the plaster can continue. Tom is reusing old oak beams to simulate collar ties and rafters, and he and Norm fabricate the final joint and install the pieces.

  • Premiera: Sty 1979
  • Odcinki: 1196
  • Obserwujący: 80
  • Trwający
  • PBS
  • Czwartek w 20