The Art Of Boat Building

The Art Of Boat Building

Installing The Coaming (Pt 2) (2x46)


Data emisji: Kwi 24, 2021

In part 2 of installing the coaming of The Art of Boat Building (S2-E46) Bob Emser boat builder demonstrates the fairing of the coaming and its installation on the Haven 12 1/2 designed by Joel White. During the installation Bob shows how bungs and cut and finished. The black walnut coaming gets several coats of Total Boats Lust varnish.

  • Pozycja #
  • Premiera: Lip 2018
  • Odcinki: 135
  • Obserwujący: 0
  • Trwający
  • YouTube
  • w 0