Tips From A Shipwright

Transom Frame (4x14)


Data di messa in onda: Giu 14, 2025

Building the outer framing for the transom of Orca with tips on using bronze fasteners and bedding compound for strong joints.

  • Posizione #
  • Iniziato: Giu 2016
  • Episodi: 142
  • Followers: 0
  • In corso
  • YouTube
  • alle 0