A beautiful green week where I'm working alone preparing the drainage and plumbing for the concrete floor. I'm locating the crossbeam where the chimney is going out of the wall. Finally, I'm out on a short hike in the valley.
0:00 Taking the tent stove out
1:30 Backing bread
8:37 Connecting rain gutters
9:46 Making a hole in the wall
13:17 Looking at the garden
14:23 Extra drain pipe
15:16 Chickens out and lunch
18:00 Fixing the hole under the wall
19:47 Out for supplies
22:10 Pouring concrete
23:48 Shovelling sand
24:39 Making a compacter
25:42 A snail
27:06 septic tank
29:12 Looking at drawings
31:13 More pipes
32:10 Testing the connections
34:57 Making salad
36:31 Connecting shower drain
38:02 Outro monologue