The Art Of Boat Building

The Art Of Boat Building

Installing The Coaming (Pt 2) (2x46)


Data di messa in onda: Apr 24, 2021

In part 2 of installing the coaming of The Art of Boat Building (S2-E46) Bob Emser boat builder demonstrates the fairing of the coaming and its installation on the Haven 12 1/2 designed by Joel White. During the installation Bob shows how bungs and cut and finished. The black walnut coaming gets several coats of Total Boats Lust varnish.

  • Posizione #
  • Iniziato: Lug 2018
  • Episodi: 137
  • Followers: 0
  • In corso
  • YouTube
  • alle 0