The Art Of Boat Building

The Art Of Boat Building

Installing The Garboard & Carvel Planking (Part3) (2x19)


Data di messa in onda: Gen 25, 2020

In this video the Garboard is installed on the starboard side of the Haven 12 1/2.

  • Posizione #
  • Iniziato: Lug 2018
  • Episodi: 137
  • Followers: 0
  • In corso
  • YouTube
  • alle 0