The New Yankee Workshop

The New Yankee Workshop

Kitchen Project - The Bar (8) (20x8)


Data di messa in onda: Feb 23, 2008

Norm uses natural cherry to construct the wet bar, which is separated from the kitchen. It has a small copper sink and natural cherry paneled walls. The counter top is made of cheery and the bar has a wine cooler, mirrored surfaces, glass shelves, and concealed lighting. Norm adds twin glass-paneled doors as a finishing touch. (Part 8 of 9)

  • Iniziato: Gen 1989
  • Episodi: 286
  • Followers: 11
  • Terminata
  • PBS
  • Sabato alle 13