Hometime
Lodge Style Log Cabin: Interior Progress (13x10)
Bemutató időpontja: 1999 Ápr 06
Dean talks about the unique, soapstone masonry heater being installed in the lower level as work continues on taping the drywall and siding the bumpouts. In addition, Dick Biscobing shows Robin how the log railings are being assembled on the master bedroom loft, and Dean and Robin talk about spreading crack isolation membrane over the underlayment to help keep tile from cracking.
- Bemutatott: 1992 Feb
- Epizódok: 268
- Követők: 1