Arlington 2014: Part 6: Additional Details (35x14)
Fecha de emisión: Feb 08, 2014
The new kitchen windows are inspected. Cast iron waste pipes are installed with a traditional lead and oakum joint. Outside -- trim is replicated and new siding is installed.