The This Old House Hour
Bedford Project (10x7)
Udgivelsesdato: Nov 17, 2011
The existing cellulose insulation in the walls of the oldest part of the house is topped off; raised beds are built from the fieldstone of the old foundation; the new addition's roof is waterproofed with self-sealing membrane. Also: repairing a cracked asphalt walkway; removing mold from an attic.
- Premieret: Feb 2009
- Afsnit: 189
- Følgere: 12