Extreme Engineering

Extreme Engineering

Woodrow Wilson Bridge (3x4)


Ausstrahlung: Dez 09, 2005

The 40-year-old Woodrow Wilson Bridge is being replaced by a new span crossing the Potomac River between Maryland and Virginia, just south of Washington, D.C.

  • Premiere: Apr 2003
  • Episoden: 77
  • Anhänger: 11
  • Geendet
  • Unbekannt
  • Mittwoch um 21